True Manufacturing Company TH Installation Of Legs And Castors, Securing Castors, Unit Leveling

Models: TH-23 TH-23G TH

1 13
Download 13 pages 62.07 Kb
Page 6
Image 6
INSTALLATION OF LEGS AND CASTORS

True Food Service Equipment, Inc.

INSTALLATION / OPERATION INSTRUCTIONS

INSTALLATION OF LEGS AND CASTORS

Securing Castors:

To obtain maximum strength and stability of the unit, it is important that you make sure each castor is secure. The bearing race on the castor on the top edge of the leg must make firm contact with the rail.

Unit Leveling:

Four leveling shims have been provided for leveling castored units positioned on uneven floors. Shims must be positioned between rail end and bearing race. True recommends a four shim limit to any single castor.

A.Turn the bearing race counter-clockwise until the cabinet is level. Level front to back and side to side. (diagonally)

B.Install the desired number of shims, making sure the slot of the shim is in contact with the threaded stem of the castor.

C.If more than one shim is used, turn the slot at a 90° angle so they are not in line.

D.Turn the bearing race clockwise to tighten and secure the castor by tightening the anchoring bolt with a 3/4 inch open-end wrench, socket, or the tool provided.

CAUTION

To avoid damage to lower rail assembly, slowly raise

unit to upright position after installing castors.

1

Thread castor into the underside of cabinet frame rail.

 

 

 

 

 

 

 

 

 

2

 

 

 

 

3

 

4

 

For leveling, insert the shim

Use the tool provided to tighten the

Thread leg into cabinet

between the castor and frame rail. castor into place.

bottom frame rail.

5

The end of the leg is adjustable to easy leveling.

Lower Rail

Lower Rail Assembly

Assembly

 

 

Rail End

Rail End

Snug Fit

 

 

Here

Snug Fit

Bearing

Here

Race

 

Leveling Shim

LegCastorSecuring Castors:

5

www.truemfg.com

5

Page 6
Image 6
True Manufacturing Company TH-23G installation manual Installation Of Legs And Castors, Securing Castors, Unit Leveling