NGC Tornado (1 PHASE)

Page 10.1

NGC Energy.xls

NGC Tornado (1 PHASE)

 

Changeable Parameters

 

 

 

 

 

 

Operating Time

12

Hours

 

 

 

 

 

 

 

 

 

 

 

Energy Costs

$0.11

kWHr

 

 

 

 

 

 

 

 

 

 

 

Snooze Mode

0.00

Hours

 

 

 

 

 

 

 

 

 

 

 

Cook Cycles/Day

100

Cooks/Day

 

 

 

 

 

 

 

 

 

 

 

Typical Cook Time

60

Seconds

 

 

 

 

Do Not Change the following values

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Power

 

 

 

 

 

Time (min)

(Watts)

Cost/Day

Balance of Time (hrs)

 

 

Warm up

15

5277

$0.15

11.75

 

 

Cooking

100

5000

$0.96

10.08

 

 

Snooze Idle

0

1100

$0.00

10.08

 

 

Idle

605

1400

$1.62

0

 

 

 

 

 

 

 

 

 

Total/Day

 

 

$2.72

Yearly

 

 

Total/Month

 

 

$81.72

$980.62

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HVAC Requirements Per Operating Time -- Note: Approximations Only

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Average

 

 

 

 

 

 

Cooling

 

 

 

Total

Total average

Total Environmental

Requirement

 

Average Energy Cooking And Idle (J)

Warmup Energy (J)

Energy (J)

Power (W)

Load kBtu/hr

(ton of AC)

 

 

 

 

 

 

 

 

80820000

4749300

85569300

1981

6.759028

0.563

 

 

 

 

 

 

 

11/6/2008

Confidential

James K. Pool

Page 17
Image 17
Turbo Chef Technologies Tornado 2 manual NGC Tornado 1 PHASE, kWHr, Cooks/Day, James K. Pool