Assembly of Furnace
Your furnace requires the following items to be assembled or installed by the service person:
Feed Door Handle
Feed Door Latch
Smoke Curtain
Blowers and Blower Controls Electrical Connections
1. | Remove all parts from inside the |
| furnace and inspect for damage, |
| including the firebrick as some |
| breakage could occur during ship- |
| ment. |
2. | Assemble the feed door handle |
WASHER
LOCKNUT
FEED DOOR HANDLE
| as shown in Figure 8. Install the |
| latch as illustrated in Figure 9. |
3. | Attach the smoke curtain to the |
| firebox as shown in Figure 10. |
| Install Honeywell thermostat on |
4. | rear of furnace cabinet as shown |
| in Figure 11. |
| Remove blowers from cartons. |
5. | Remove junction box cover. At- |
| tach clip nuts as per Figure 11. |
| Install blowers and gaskets with |
| |
| Wire right side blower first per |
6. | wiring diagram (Figure 12) and |
| replace cover on junction box on |
| blower. |
| Wire left blower same as above |
7. | and replace cover. |
| Complete all wiring in junction box |
8. | by referral to the wiring diagram |
| and Figure 11 - Blower and Com- |
| ponent Assembly. Replace cover |
| on junction box. |
| Check operation of shaker grates |
9. | with grate handle before operat- |
| ing furnace. |
FIG. 8
FIG. 9
SMOKE DOOR CLIP
NUT
CARRIAGE BOLT
SMOKE CURTAIN
FIG. 10
10