United States Stove 1602G, 1802G Spring Handles, Distribution Blower & Acc, Wiring Diagram

Models: 1602G 1802G

1 20
Download 20 pages 7.72 Kb
Page 7
Image 7
SPRING HANDLES

SPRING HANDLES

Attach the four(4) spring handles to the Feed/Ash Doors, Baffle Rod, and Shaker Rod by twisting the springs counter- clockwise while applying pressure until you have screwed them approximately 3/4”-1” onto the rods.

(4) Spring Handles

DISTRIBUTION BLOWER & ACC.

1.Remove all contents and insure that all components are present for assembly. See the part list below

2.Begin by attaching the blowers to the unit. Insert a clip into each mounting hole in the furnace’s cabinet back. Be sure to install the gasket between the blower and cabinet back. Insert the eight bolts provided and tighten.

3.Mount the Honeywell limit control to the cabinet back. The conduit assembly should already be attached to the limit control, otherwise, do so then make the correct wiring con- nections to the limit control. See wiring diagram.

4.Next, mount the junction box and insulation using two of the #10 x 1/2 screws provided. Make a small slice in the 5 x 5 in- sulation to allow the wires from the draft blower to protrude, then Install it between the cabinet back and junction box, with the foil side to the cabinet back. Attach the conduit assembly from the limit control to the junction box as shown.

5.If not already installed, snap the rocker switch into the top of the junction box. Provide a 110 volt power supply and con- nect to the junction box with the cable clamp to the right side.

6.Attach the two longer conduit assemblies to the junction box and to each blower.

7.Before mounting the Fan Center, make all the wire connec- tions per the wiring diagram, then attach the fan center to the junction box.

All electrical connections should be done by a

qualified electrician.

NOTE: The extra brown wire on the fan center has

no use. It should be capped off or removed.

The conduit may be cut shorter to provide a cleaner

installation.

(2)800 CFM Blower

(2)Gasket, Blower

(8)Tinnerman Clip, 1/4-20

(8)1/4-20 x 3/4 Bolt

(2)Conduit Assembly (5ft)

(1)Honeywell Limit Control

(1)Conduit Assembly (1ft)

(1)Junction Box

(1)Insulation (5” x 5”)

(1)Rocker Switch

(1)Romex Cable Clamp

(1)Fan Center Control

(3)73B Wire Nut

(1)74B Wire Nut

(1)Female Term. (blue)

(1)Female Term. (red)

(8)#10 x 1/2 Screw

WIRING DIAGRAM

USSC

7

Page 7
Image 7
United States Stove 1602G, 1802G Spring Handles, Distribution Blower & Acc, Wiring Diagram, qualified electrician