FORCED DRAFT BLOWER - 69189
Using two
(1) Draft Blower
(1) Draft Blower Adapter
(2)
(2)
(3)
FIREBRICK AND BAFFLE REPLACEMENT
FIREBOX BRICK REPLACEMENT | BAFFLE/BRICK REPLACEMENT |
This furnace comes from the factory with the firebrick in- stalled. However, if brick replacement is necessary, follow these instructions. Before furnace operation, remove the brick retaining strip. This piece is used during shipping to reduce brick damage.
For model 1602, there are 6 full brick and 1 half brick per side. Install the half brick first by putting the bottom of the brick in first and let it rest against the firebox side and fire grates. Then slide it to the rear. After that, install the #2, #3, #4, #5 & #6 brick, sliding the 6th brick forward to allow for the 7th brick. Repeat for opposite side.
For model 1802, there are 8 full brick and 1 half brick per side. Install the brick in the same manner as previously in- structed for the model 1602.
NOTE: Prior to operation, be sure to remove the brick retaining strips.
If baffle replacement is necessary, slide the baffle out until you can access the nuts thru the flue outlet. Once the nuts have been removed, slide the baffle off the rod and thru the opening in the firebrick. You may have to remove one of the firebrick to make baffle removal easier.
For model 1602, there are 4 full brick and 1 half brick in the top of the furnace. Install the brick by inserting one end of the brick angled upward and then allowing the opposite end to rest on the firebox lip. Lay the brick between the spacer and firebox back. Slide the baffle to the rear and let it rest on that half brick. After installing brick #2 in the front, install #3 and slide it under the baffle. Finally install bricks #4 and #5.
For model 1802, there are 6 full brick in the top of the fur- nace. Install the brick in the same manner as previously instructed above.
8 | USSC |