Vanguard Heating VP26A, VP26TA VN30A Continued, Folding Anchor, Installing Bottom Mounting Screws

Models: VP26TA VN30A VN18TA VP22ITA VN30TA VN18A, VN18TA, VP16A, VP16TA, VP26A, VP26TA, VN30A, VN30TA, VP16ITA, VP22ITA VP26A VP16ITA VP16A VP16TA

1 36
Download 36 pages 12.49 Kb
Page 10
Image 10
Figure 9 - Folding Anchor

INSTALLATION

Continued

2.Fold wall anchor as shown in Figure 9.

3.Insert wall anchor (wings first) into hole. Tap anchor flush to wall.

4.For thin walls (1/2" or less), insert red key into wall anchor. Push red key to “pop” open anchor wings.

IMPORTANT: Do not hammer key!

For thick walls (over 1/2" thick) or solid walls, do not pop open wings.

5.Place mounting bracket onto wall. Line up last hole on each end of bracket with wall anchors.

6.Insert mounting screws through bracket and into wall anchors.

7.Tighten screws until mounting bracket is firmly fastened to wall.

Figure 9 - Folding Anchor

Installing Bottom Mounting Screws

1.Locate two bottom mounting holes. These holes are near bottom on back panel of heater (see Figure 12).

2.Mark screw locations on wall.

3.Remove heater from mounting bracket.

4.If installing bottom mounting screws into hol- low or solid wall, install wall anchors. Fol- low steps 1 through 4 under Attaching To Wall Anchor Method, pages 9 and 10.

If installing bottom mounting screw into wall stud, drill holes at marked locations using 9/64" drill bit.

5.Replace heater onto mounting bracket.

6.Place spacers between bottom mounting holes and wall anchor or drilled hole.

7.Hold spacer in place with one hand. With other hand, insert mounting screw through bottom mounting hole and spacer. Place tip of screw in opening of wall anchor or drilled hole.

8.Tighten both screws until heater is firmly se- cured to wall. Do not over tighten.

Note: Do not replace front panel at this time. Replace front panel after making gas connections and checking for leaks (see pages 12 and 13).

Figure 10 - Popping Open Anchor Wings

For Thin Walls

Placing Heater On Mounting Bracket

1.Locate two horizontal slots on back panel of heater.

2.Place heater onto mounting bracket. Slide horizontal slots onto stand-out tabs on mount-

ing bracket.

Horizontal Slots

Mounting Bracket (attached to wall)

Stand-Out Tab

Front View

Wall

Heater

Spacer

Side View

Figure 12 - Installing Bottom Mounting

Screws

Figure 11 - Mounting Heater Onto

Mounting Bracket

10

www.desatech.com

113052-01A

Page 10
Image 10
Vanguard Heating VP26A, VP22ITA Continued, Folding Anchor, Installing Bottom Mounting Screws, Popping Open Anchor Wings