Vermont Casting 1695CE Connecting Flue Pipe - Clearances, Vermont Castings Intrepid Multi-Fuel

Models: 1695CE

1 28
Download 28 pages 47.08 Kb
Page 10
Image 10
Connecting Flue Pipe - Clearances

Vermont Castings Intrepid Multi-Fuel

B

Manual background AManual background

Fig. 10 Minimum clearances.

Connecting Flue Pipe - Clearances

Single wall connecting fluepipes can reach extremely high temperatures; therefore, clearances from the con- necting fluepipe (chimney connector) must comply with the requirements of Part J of Building Regulations 2000 (Combustion Appliances and Fuel Storage Systems). This can be achieved by following the recommenda- tions of Approved Document ‘J’. These are as shown in Figure 11.

ST486a

at least

 

3 x D

D

 

at

leastD

x

 

3

at least 1.5 x D

at least 3 x D

Fluepipe Manual background

D

 

at least

 

1.5 x D

 

 

 

 

 

 

 

 

 

 

 

 

at least 1.5 x D

at least 1.5 x D

at least 1.5 x D

Elevation

Without

Shield

Fig. 11 Connecting fluepipe clearances.

 

Air space of at least 12 mm

Plan Without

between noncombustible shield

Shield

and combustible material

 

Plan With

Elevation

Shield

With Shield

ST911

 

10

2000970

Page 10
Image 10
Vermont Casting 1695CE Connecting Flue Pipe - Clearances, Vermont Castings Intrepid Multi-Fuel, 2000970