Brookhaven Direct Vent Gas Fireplace

3.Install vent system. See Page 12, Steps 2 through 5.

4.Ensure a watertight seal is made around the vent pipe coming through the wall.

5.Apply high temperature sealant caulking (supplied) around the 4” and 7” snorkel collars.

6.Slide the snorkel into the vent pipe and secure to the wall.

7.Level the soil to maintain a 4” (102 mm) clearance below snorkel. (Fig. 21)

Zero Clearance Sleeve

Screws

(if required)

 

 

7TDVSNORK

 

(Snorkel)

Firestop

 

Vertical Through-the-Roof Application

This gas fireplace has been approved for:

Vertical installations up to 40’ (12 m) in height. Up to a 10’ (3 m) horizontal vent run can be installed within the vent system using a maximum of two 90° elbows. (Fig. 23)

Up to two 45° elbows may be used within the hori- zontal run. For each 45° elbow used on the horizon- tal plane, the maximum horizontal length must be reduced by 18” (450 mm).

Example: Maximum horizontal length:

No elbows

=

10’ (3 m)

1 x 45° elbow

=

8.5’ (2.6 m)

7” Pipe

24” (610 mm )

Minimum *

4” Clear- ance Min.

Window

Well

Gravel

Drain

Foundation Wall

*A minimum of 24” (610 mm) vertical pipe must be installed when using the 7TDVSNORK.

2 x 45° elbows = 7’ (2.1 m)

A minimum of an 8’ (2.5m) vertical rise is required.

Two sets of 45° elbow offsets may be used within the

vertical sections. From 0 to a maximum of 8’ (2.5 m)

of vent pipe can be used between elbows. (Fig. 24)

7DVCS supports offsets. (Fig. 25) This application

will require that you first determine the roof pitch

and use the appropriate starter kit. (Refer to Venting

Components List)

The maximum angular variation allowed in the sys-

tem is 270°. (Fig. 24)

The minimum height of the vent above the highest

BG402a

Fig. 21 Below grade installation.

Do not backfill around snorkel.

A clearance of at lest 4” must be main- tained between the snorkel and the soil.

If the foundation is recessed, use recess brackets (not supplied) for securing lower portion of the snorkel. Fas- ten brackets to wall first, then secure to snorkel with self drilling #8 x 1/2 sheet metal screws. It will be necessary to extend vent pipes out as far as the protruding wall face. (Fig. 22)

 

Snorkel

Foundation

 

Recess

 

 

Wall Screws

Watertight Seal

Sheet Metal

Around Pipe

Screws

BG401

Fig. 22 Snorkel installation, recessed foundation.

point of penetration through the roof is 2’ (610 mm).

(Fig. 27)

Max. Height 40’ (12.2m)

Min. Height 8’ (2.4m)

Max. 10’ (3m)

Support Straps

Every 3’ (.9m)

FP1183

Fig. 23 Support straps for horizontal runs.

Vertical Through-the-Roof Installation

1.Locate your fireplace.

2.Plumb to center of the (4”) flue collar from ceiling above and mark position.

3.Cut opening equal to 9³⁄” x 9³⁄” (240 x 240 mm).

14

10009459

Page 14
Image 14
Vermont Casting 20DVT Vertical Through-the-Roof Application, Vertical Through-the-Roof Installation