Air Shutter

FP1631

Fig. 40 Back burner housing.

Pilot Orifice Conversion

1.Remove pilot hood by lifting up. (Fig. 41)

2.Remove pilot orifice with 5/32” Allen wrench. (Fig. 42)

3.Install conversion pilot orifice.

4.Reinstall pilot hood and be sure to align with index tab.

5.Turn the gas supply valve and gas valve on and test for leaks. Use a 50/50 solution of liquid soap and water to test for leaks at gas fittings and joints. Apply water/soap solution with brush only - do not over ap- ply. NEVER test with an open flame.

6.Follow procedure on rating plate to light the pilot. Check for leaks.

7.Turn main burner on and check for leaks.

8.Reinstall logs and window frame assembly. Refer to Page 18 for proper log placement.

Installation complete.

Brookhaven Direct Vent Gas Fireplace

Pilot Hood

Pilot Bracket

CO105a Fig. 41 Remove pilot hood.

Index Tab

Allen

 

Wrench

Snap Ring

CO106a

Fig. 42 Remove pilot orifice.

10009459

23

Page 23
Image 23
Vermont Casting 20DVT installation instructions Pilot Orifice Conversion