Vermont Casting H33BDVRRN General Information on Assembling DV Components, Crimped End Pipes

Models: H33BDVRRN H33BDVRRNP

1 32
Download 32 pages 30.63 Kb
Page 9
Image 9
 D

Pyromaster© H33BDVRRN/P

Termination Clearances

Termination clearances for buildings with combustible and noncombustible exteriors.

Inside Corner

Outside Corner

Recessed Location

 

 

 

B =

 

A =

 

Combustible

A

Combustible

 

6"(152mm)

 

6"(152mm)

V

Noncombustible

 

 

2"(50mm)

 

Noncombustible

V

2"(50mm)

B

 

Balcony -

 

Balcony -

 

with no side wall

 

with perpendicular side wall

 

G

H

 

 

 

 

 

V

 

V

 

 

Combustible &

J

G =

 

 

 

Noncombustible

 

Combustible&

 

 

 

Noncombustible

H = 24"(610mm)

 

12"(305mm)

 

J = 20"(508mm)

 

 

 

 

General Information on Assembling DV ComponentsCrimped End Pipes D Canadian Installations:USA Installations:

CC

Manual background E Manual background

V

C = Maximum depth of 48" (1219mm) for recessed location.

D = Minimum width for back wall of a recessed location. Combustible 38"(965mm) Noncombustible 24"(610mm)

E = Clearance from corner in recessed location. Combustible 6"(152mm) Noncombustible 2"(50mm)

584-15

Fig. 8 Termination clearances.

General Information on Assembling DV Components

Crimped End Pipes

Before joining elbows and pipes apply a bead of high temperature sealant to the crimped end of the elbow or pipe. Join the pipes using a 2” (50mm) overlap and secure the joints with three sheet metal screws. (Fig. 9) Wipe off excess sealant.

Canadian Installations:

Venting system must be installed in accordance with the current CSA-B149.1 installation code.

USA Installations:

The venting system must conform with local codes and/or the current National Fuel Gas code ANSI Z223.1.

Only venting components manufactured by CFM Corporation can be used in Direct Vent systems.

 

Sealant

1" (25mm)

 

 

 

 

Screw Holes

 

 

FP1175

Fig. 9

Apply a bead of high temperature sealant.

It is possible to use CFM Corporation 4” & 7” direct vent crimped pipe and elbows with CFM Corporation 4” & 7” twist-lock pipe. NOTE: The crimped pipe must be used first.

10004798

9

Page 9
Image 9
Vermont Casting General Information on Assembling DV Components, Crimped End Pipes, Pyromaster H33BDVRRN/P, D Cc E