LHEDV Series Direct Vent Insert
Liner Installation
The collar extending down from the termination base is the air intake connector. Be sure the flex vent, which is connected to this collar, is also connected to the labelled air intake flue collar on the fireplace. Make sure the flex vent is attached on the correct collar and cap for exhaust as well.
Slide the insulation provided in the termination kit over the two (2) 3" flex liners, (to be attached to the 3" flue collar and cap of the termination). Feed one 3" flex vent from the bottom of the termination up through the 4" sleeve. Apply
Flue gas exits through the vent termination rain cap
Outside combustion air enters through the lower level of the vent termination
Secure with clamp and three screws
1)Attach flexible pipe to rain cap
2)Secure with clamp
3)Attach raincap to vent termiantion us- ing three screws
Pull flexible pipe through vent termination
the sleeve. Attach cap to the sleeve with four (4) screws supplied. Apply
In case the fireplace opening is only minimum height 21" (533 mm) and access from the front is not possible, follow the instructions below.
1.Remove flue collar plate assembly. Unbolt the top fastener plate and move it to the back first before sliding the flue collar plate out from the top of the unit. (Fig. 13)
2.Apply a bead of
3.After the flue collar plate is set on the cabinet top, make sure the front edge of the flue collar plate is completely in contact with the back edge of the cabi- net top. (Fig. 16)
4.Put the machine screw back into the fastener plate. Bolt the plate until it is locked. (Fig. 17)
Under no circumstances should insulation be put between the damper and the top of the unit. This may cause condensation and overheating of the unit.
| NOTE: |
| Minimum Vent Height |
| - 12 feet |
| Maximum Vent Height |
Air Intake | - 35 feet |
| |
Air intake collar with | Exhaust |
| |
label secured with | Exhaust collar secured |
clamp and three | |
screws | with clamp and three |
| screws |
|
|
| FP1280 |
Fig. 10 | Liner installation. |
|
|
| Spring located in |
|
|
| between the liner |
|
|
| and chimney kit |
| HEDVCAK |
|
|
| Installation |
|
|
| Secure this |
|
|
| kit with three |
| Air Intake |
| (3) screws |
| 6ft. | provided | |
|
| ||
|
| (183cm) |
|
|
| Exhaust |
|
HEZC Zero |
|
| |
Clearance Kit |
|
|
FP1280a
Fig. 11 Liner installation with zero clearance kit.
10004894 | 9 |