Parallel Installation: Minimum Clearance

Radiance Direct Vent/Natural Vent Gas Heater

Parallel Installation: Minimum Clearance

and Flue Centerline, Direct Vent and Natu-

ral Vent

42" (1070mm)

Min. Alcove Width

4" (102mm)

48"

(1220mm) Max. Alcove Depth

 

 

 

6"

 

 

 

6"

 

 

 

 

 

 

 

ST130

 

(150mm)

 

 

 

(150mm)

Fig. 3 Parallel installation, minimum back and side clear- ances, and flue centerlines.

Corner Installation: Minimum Clear- ance and Flue Centerline, Direct Vent & Natural Vent

18"

(457mm)

6"

(150mm)

18"

(457mm)

6"

(150mm)

ST129

Fig. 4 Corner installation, minimum corner clearances and flue centerline.

Wall Centerline from Floor

Direct Vent Only

A

ST131b

A

Effective Minimum

Centerline 57” (1448mm)(Vermont Castings/Majestic Pipe)

55” (1399mm) (Simpson DuraVent Pipe)

Fig. 5 Minimum wall centerline.

Wall and Ceiling Clearances

Direct Vent Only

 

 

 

 

D

 

 

 

 

 

 

 

 

 

 

B

Cand Flue Centerline, Direct Vent and Natu-ral VentWall Centerline from Floor

Wall and Ceiling ClearancesHearth RequirementsManual backgroundManual background A Manual background

A: Rear Wall

4” (102mm)

B: Min. Clearance

44” (1118mm)*

C: Min. Alcove Height

72” (1830mm)*

D: Max. Alcove Depth

48” (1220mm)

Sidewall Clearance

6” (150mm)

*needed for installing DuraVent Minimum Vent Kit #2792 or

CFM Corporation Minimum Vent Kit #7TFSMSK.

ST101b

 

Fig. 6 Dimensions and clearances to ceiling or alcove.

Hearth Requirements

The Radiance Heaters must be installed on rigid floor- ing. When the heater is installed directly on any com- bustible surface other than wood flooring, a metal or wood panel extending the full width and depth of the unit must be used as the hearth. There are no other hearth requirements.

66

20004188

Page 6
Image 6
Vermont Casting RDVOD 3399 Parallel Installation Minimum Clearance, and Flue Centerline, Direct Vent and Natu, ral Vent