On/Off Switch Wiring | OFF | ON | |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Black | opile | ||||
|
|
|
| Therm |
|
|
| |
TP/TH |
|
|
|
|
|
| ||
TP |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
| Black | ||||
TH |
|
|
|
|
|
|
| ST124b |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Optional Thermostat Wiring | Thermostat |
| (Optional) |
Radiance
4.Replace burner. Slide the burner in at an angle with left side lower than the right side. Slide the left side onto the injectors, making sure the burner leg remains at a 90° angle to the base. (Fig. 19) Lower the right hand side down in to place. Make sure the burner is as far left as possible and the injector shoulders are inside the burner.
Left Burner Leg |
Injector Orifices |
90° |
ST353a
Black
TP/TH
TP
TH
opileTherm
Black
ST124c
Fig. 19 Be sure injector orifices remain at 90° to the base.
5.Replace left and right log bracket assembly, tighten rear log bracket, and replace logs.
6.Latches provided in catalyst kit must be installed on top of firebox. Use two phillips screws to secure in place. (Fig. 20)
Glass & Catalyst Installation
CAUTION: Air shutter must be removed when installing glass and catalyst for proper operation.
1.Remove left and right log bracket assembly by unfastening the two screws which hold the burner in place. Loosen the screw on the rear log bracket and remove the bracket.
2.Hold the burner at the right hand side and lift to clear the right burner leg. Then pull to the right to clear the injectors on the left hand side.
3.Turn burner upside down and remove air shutter. Discard air shutter. (Fig. 18)
| Air Shutter (Remove and Discard) |
| Bottom of Burner Pan |
| ST667 |
Fig. 18 | Remove air shutter and discard. |
20004555 |
Phillips |
|
Screws | Catalyst Location |
| |
| Phillips Screws |
ST671
Fig. 20 Attach glass latches.
7.Slide catalyst between top plate and firebox. Allow catalyst to “fall” into hole on top of firebox. Secure with two screws as shown in Figure 21.
| ST201 |
Fig. 21 | Install catalytic combustor. |
13