Installation, Operation and Care of
MG SERIES GAS RESTAURANT MODULAR RANGE
KEEP THIS MANUAL FOR FUTURE REFERENCE
Vulcan ranges are produced with quality workmanship and material. Proper installation, usage and maintenance of your range will result in many years of satisfactory performance.
The manufacturer suggests that you thoroughly read this entire manual and carefully follow all of the instructions provided.
INSTALLATION
UNCRATING
This range was inspected before leaving the factory. The transportation company assumes full responsibility for safe delivery upon acceptance of the shipment. Immediately after unpacking, check for possible shipping damage. If the range is found to be damaged, save the packaging material and contact the carrier within 15 days of delivery.
Carefully uncrate range and place in a
Before installing, verify that the type of gas supply (natural or propane) agrees with the specifications on the rating plate located under the
If the supply and equipment requirements do not agree, do not proceed with the installation. Contact your dealer or
LOCATION
CAUTION: The equipment area must be kept free and clear of combustible substances.
A standard 20,000 BTU burner input range must have a minimum clearance from combustible construction of 6" (15 cm) at the sides and 6" (15 cm) at the rear.
A standard 26,000 BTU burner input range must have a minimum clearance from combustible construction of 10" (25 cm) at the sides and 6" (15 cm) at the rear.
The installation location must allow adequate clearances for servicing and proper operation.
The range must be installed so that the flow of combustion and ventilation air will not be obstructed. Adequate clearance for air openings into the combustion chamber must be provided. Make sure there is an adequate supply of air in the room to allow for combustion of the gas at the burners.
– 5 –