![](/images/new-backgrounds/1074348/743487x1.webp)
V SERIES HOLDING, TRANSPORT & PROOFING CABINET |
GENERAL
INTRODUCTION
It is suggested that you thoroughly read this entire manual and carefully follow all of the instructions provided.
Carefully unpack and place in a work accessible area as near the installation position as possible.
1.Open the door and carefully remove any packaging materials. Remove 20 Tray Slides and 2 Water Pans. (10”x12”x2½”)
2.Peel off all vinyl protection film.
3.Install desired number of Tray Slides. Make sure the hook on the end of the tray slide is up.
(Fig. 1)
INSTALLATION
Before installing, verify that the electrical service agrees with the specifications on the rating plate located on the lower back corner of the cabinet. (Fig. 4) If the supply and equipment requirements do not agree, do not proceed with unpacking and installation. Contact your
UNPACKING:
The Cabinet was inspected before leaving the factory. The transportation company assumes full responsibility for safe delivery upon acceptance of the shipment. Immediately after unpacking, check for possible shipping damage to the cabinet.
If the cabinet is found to be damaged, save the packaging material and contact the carrier within 15 days of delivery.
(Fig. 1)
4.Insert one (1) Water Pan in opening at the bottom of the cabinet and insert one (1) Water Pan through slides underneath the cabinet. (Fig. 2)
WATER PAN
WATER PAN | (Fig. 2) |
3