Vulcan-Hart VP18 ML-138089 Proofing Shutdown, Dough Preparation, Proofing Guideline

Models: VP18 ML-138089

1 14
Download 14 pages 7.36 Kb
Page 8
Image 8

V SERIES HOLDING, TRANSPORT & PROOFING CABINET

F-41190 (09-10)

DOUGH PREPARATION

If Dough is Frozen:

1.Grease pan. Place frozen dough on pan and brush tops of dough with oil, cover dough lightly with a film wrap, and refrigerate until dough thaws and reaches 40F (4 to 6 hours or overnight.)

It is important during thawing that the tops of the dough product must not “crust” or dry out. This can be prevented by oiling the tops and lightly covering the dough with a film wrap. This film wrap must not be tucked in at the sides – it should merely lie on top of the greased dough. Note: Always remove this film wrap before proofing.

2.Remove dough from refrigerator and allow the dough to reach room temperature.

Hint: You may want to place the dough on a greased room temperature pan. This helps shorten the proofing time. Placing cold pans in the proofer brings the temperature down inside the cabinet and lengthens the proofing time.

PROOFING GUIDELINE

 

 

 

Approx.

 

 

# Of

Dough

Proof

Cabinet

 

Buns

Temp.

Time

Temp.

FRESH PREPARED DOUGH

1 to 10

Room Temp.

30 min.

90-95⁰F

10 to 20

Room Temp.

33 min.

90-95⁰F

 

 

20 to 30

Room Temp.

35 min.

90-95⁰F

 

30 to 40

Room Temp.

38 min.

90-95⁰F

 

40 to 50

Room Temp.

40 min.

90-95⁰F

REFRIGERATED DOUGH

1 to 10

30⁰ - 45⁰F.

35 min.

90-95⁰F

10 to 20

30⁰ - 45⁰F.

39 min.

90-95⁰F

 

 

20 to 30

30⁰ - 45⁰F.

43 min.

90-95⁰F

 

30 to 40

30⁰ - 45⁰F.

46 min.

90-95⁰F

 

40 to 50

30⁰ - 45⁰F.

50 min.

90-95⁰F

PROOFING SHUTDOWN

The Cabinet and its parts are hot. Be very careful when operating, cleaning, or servicing the cabinet.

When the use of the proofing cycle is completed:

1.Turn the thermostat to the Off position.

2.Keep the fan switch in the On position. This helps remove the excess humidity.

3.Open the door slightly to let out the humidity and to prevent mold.

4.Allow cabinet to cool down completely.

5.Unplug power cord.

6.Empty and clean both water pans.

7.Clean cabinet according to instructions in this manual.

7

Page 8
Image 8
Vulcan-Hart VP18 ML-138089 operation manual Proofing Shutdown, Dough Preparation, Proofing Guideline