Wayne-Dalton 7100 Series installation instructions Parts Breakdown

Models: 7100 Series

1 22
Download 22 pages 49.43 Kb
Page 2
Image 2
Parts Breakdown

Parts Breakdown

NOTE: The illustrations shown on this page are general representations of the door parts. Each specific door models may have unique variations.

G7.

 

G2.

 

 

 

G2.

 

 

 

G1.

 

G3.

 

 

 

 

G7.

 

 

G10.

G8.

 

 

 

 

 

 

 

G4.

G6.

 

 

G5.

 

 

 

 

D1.

 

 

 

A1.

D2.

 

 

 

 

 

D3.

 

 

 

A2.

 

 

 

 

 

H3.

 

 

 

F1.

 

G9.

 

 

G9.

G8.

D2.

Manual background G4.

G5.

C1.

C2.

C2.

C3.

D1.

D3.

G10.

A1.

D1.

E1.

A2.

F2.

F3.

I1.

H3.

F1.

H2.

E2.

F6.

F4.

F6.

F7.

F4.

B3.

 

B2.

 

 

 

 

 

 

A2.

 

B1.

 

A4.

H1.

 

 

 

 

A1.

 

K1.

 

 

 

 

A3.

 

 

J1.

F2.

F3.

I1.

A. Track Rollers (As Required):

A1. Short Stem Track Rollers

A2. Long Stem Track Rollers

A3. Short Stem Tandem Track Rollers

A4. Long Stem Tandem Track Rollers B. Graduated End Hinges:

B1. Single Graduated End Hinges (S.E.H.), Industry Standard

B2. Double Graduated End Hinges (D.E.H.), Industry Standard

B3. Half Center Hinges (As required) C. Stacked Sections:

C1. Top Section

C2. Intermediate(s) Section (As Required)

C3. Bottom Section

D. Top Fixtures (As Required):

D1. Top Fixture Bases

D2. Top Fixture Slides

D3. “L” Reinforcing Brackets (As Required) E. Strut(s) (As Required):

E1. Strut (2” U-shaped), E2. Strut (3” U-shaped) F. Tracks (As Required):

F1. Left Hand and Right Hand Horizontal Track Assemblies

F2. Left Hand and Right Hand Riveted Track Assemblies (As Required)

F3. Left Hand and Right Hand Wall Angle Track Assemblies (As Required)

F4. Left Hand and Right Hand Vertical Track Assemblies (As Required)

J1.

F7.

F5.F5.

F5. Left Hand and Right Hand Vertical Tracks (As Required)

F6. Left Hand and Right Hand Fully Adjustable (F.A.) Flag Angles (As Required)

F7. Left Hand and Right Hand Fully Adjustable (F.A.) Jamb Brackets (As Required) G. Torsion Spring Assembly (As Required):

G1. Center Bracket Bushing Assembly (As Required)

G2. Center Bearing Bracket (As Required)

G3. Torsion Shaft/Torsion Keyed Shaft (As Required)

G4. Torsion Keyed Shafts (As Required)

G5. Keys (As Required)

G6. Center Coupler Assembly (As Required)

G7. Right Hand and Left Hand Torsion Springs (As Required)

G8. Right Hand and Left Hand Cable Drums

G9. Counterbalance Lift Cables

G10. Right Hand and Left Hand End Bearing Bracket (As Required) H. Rear Back Hangs:

H1. Left Hand Rear Back Hang Assemblies

H2. Right Hand Rear Back Hang Assemblies

H3. Left and Right Hand Rear Center Back Hang Assemblies (As Required)

I. Bottom Corner Bracket (As Required):

I1. Left Hand and Right Hand Bottom Corner Brackets

J. Track Roller Carriers (As Required):

J1. Track Roller Carriers

K. Bottom Weather Seal (As Required):

K1. Bottom Weather Seal (Door Width)

2

Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer,

refer to your local yellow pages business listings or go to the Find a Dealer section online at www.Wayne-Dalton.com

Page 2
Image 2
Wayne-Dalton 7100 Series installation instructions Parts Breakdown