Removing an Existing Door

4 Section High Strutting Schedule

Intermediate II

N/A

Top Of Section

 

 

N/A

Bottom Of section

 

 

 

 

Intermediate I

(1) Long

Top Of Section

 

 

N/A

Bottom Of section

 

 

 

 

Bottom

(1) Long

Top Of Section

 

 

(1) Short

Bottom Of section

 

 

 

 

2” Strut

3” Strut

 

Long strut

for tracks, springs, etc. to allow the door to open properly. If the door is to be motor operated, 2-1/2” (64 mm) of additional headroom is required.

Note: 6” low headroom conversion kit is available for 12” radius only. Contact your local Wayne-Dalton dealer.

Backroom requirement: Backroom is defined as the distance needed from the opening back into the garage to allow the door to open fully.

Backroom Requirements

Door Height

Track

Manual Lift

Motor Operated

 

 

 

 

6’0” to 7’0”

15” Radius

98” (2489 mm)

125” (3175 mm)

 

 

 

 

7’1” to 8’0”

15” Radius

110” (2794 mm)

137” (3480 mm)

 

 

 

 

Headroom Requirements

Track Type

Space Needed

 

 

15” Radius

14 1/2” (368 mm)

 

 

Upper hinge

 

Short strut

 

leaf

 

 

Center

 

 

 

Lower hinge

 

Hinges are stamped for

hinge(s)

leaf

 

identification

 

2

1

 

1

Removing an Existing Door

Important: Counterbalance spring tension must always be released before any attempt is made to start removing an existing door.

Preparing the Opening WARNING

A powerful spring releasing its energy suddenly can cause severe or fatal injury. To avoid injury, have a trained door systems tech- nician, using proper tools and instructions, release the spring tension.

For detailed information see supplemental instructions “Removing an Existing Door/ Preparing the Opening”. These instructions are not supplied with the door, but are available at no charge from Wayne-Dalton, A Division Of Overhead Door Corporation, P.O. Box 67, Mt. Hope, OH., 44660, or at www.Wayne-Dalton.com.

Preparing the Opening

IMPORTANT: If you just removed your existing door or you are installing a new door, complete all steps in preparing the opening.

To ensure secure mounting of track brackets, side and center brackets, or steel angles to new or retro-fit construction, it is recommended to follow the procedures outlined in DASMA technical data sheets #156, #161 and #164 at www.dasma.com.

The inside perimeter of your garage door opening should be framed with wood jamb and header material. The jambs and header must be securely fastened to sound framing members. It is recommended that 2” x 6” lumber be used. The jambs must be plumb and the header level. The jambs should extend a minimum of 12” (305 mm) above the top of the opening for Torsion counterbalance systems. For low headroom applications, the jambs should extend to the ceiling height. Minimum side clearance required, from the opening to the wall, is 3-1/2” (89 mm), for 2” track. Minimum side clearance required, from the opening to the wall, is 4-1/2” (114 mm), for 3” track.

Important: Closely inspect jambs, header and mounting surface. Any wood found not to be sound, must be replaced.

For Torsion counterbalance systems, a suitable mounting surface (2” x 6”) must be firmly at- tached to the wall, above the header at the center of the opening.

Note: Drill a 3/16” pilot hole in the mounting surface to avoid splitting the lumber. Do not attach the mounting surface with nails.

Weatherstrips (may not be included):

Depending on the size of your door, you may have to cut or trim the weatherstrips (if necessary) to properly fit into the header and jambs.

Note: If nailing product at 40°F or below, pre-drilling is required.

Note: Do not permanently attach weatherstrips to the header and jambs at this time.

For the header, align the weatherstrip 1/8” to 1/4” inside the header edge, and temporarily secure it to the header with equally spaced nails. Starting at either side of the jamb, fit the weatherstrip up tight against the temporarily attached weatherstrip in the header and 1/8” to 1/4” inside the jamb edge. Temporarily secure the weatherstrip with equally spaced nails. Repeat for other side. This will keep the bottom section from falling out of the opening during installation. Equally space nails approximately 12” to 18” apart.

Headroom requirement: Headroom is defined as the space needed above the top of the door

Suitable mounting surface

Headroom

2”x 6” lumber minimum

 

 

Header board 2”x 6”

 

 

lumber preferred

 

 

Min. side

 

 

header

room

 

Level

clearance for

 

 

 

 

2” track is

eatherstrips

Finished

3-1/2” (89

Door

mm).

W

 

Height

Min. side

 

 

 

room

 

 

 

clearance for

 

 

 

3” track is

jambs

Finishedwidth

4-1/2” (114

 

Plumb

 

 

mm).

 

Door

 

 

 

 

 

Jambs

 

Min. side room clearance for 2” track is 3-1/2” (89 mm).

Min. side room clearance for 3” track is 4-1/2” (114 mm).

Nail

Backroom

 

 

Weather-

Jamb

strips

 

 

1/8” to 1/4”

5

Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer,

refer to your local yellow pages business listings or go to the Find a Dealer section online at www.Wayne-Dalton.com

Page 5
Image 5
Wayne-Dalton 7100 Series installation instructions Removing an Existing Door, Preparing the Opening