CABLE ASSEMBLY

19.Route the Short Cable (23) around two “V”- Pulleys (6). Attach the “V”-Pulleys and two Long Cable Traps (50) to the Left Arm (47) and the Right Arm (48) as shown, using two 3/8” x

2 1/2” Bolts (7) and two 3/8” Nylon Locknuts

(21). Do not overtighten the Nylon

Locknuts. The Pulleys must be able to turn freely.

20.Remove the 1/2” Nylon Locknut (81) from the rod on the Top Frame (55). Attach the Pulley Bracket (20) to the rod on the Top Frame with the 1/2” Nylon Locknut. Route the Short Cable (23) through the Pulley Bracket as shown. Do not overtighten the Nylon

Locknut. The Pulley Bracket must be able to pivot freely.

21.Loop the Short Cable (23) as shown. Route the Short Cable up through the hole in the Top Frame (55).

Open the bag marked “Pro-Pulley”. Remove the 4 1/2” Pulley (74). Route the Short Cable

(23)over the Pulley and insert the Pulley into the hole in the Top Frame (55). Attach the Pulley using a 3/8” x 3 1/4” Bolt (8), two 3/8” Flat Washers (9), two 5/8” x 3/4” Spacers (40), and a 3/8” Nylon Locknut (21) as shown. Do not overtighten the Nylon Locknut. The Pulley must be able to turn freely.

22.Attach the indicated end of the Short Cable

(23)to the “U” Bracket (57) with a 1/4” Flat Washer (78) and a 1/4” Nylon Locknut (2).

Attach the “U” Bracket (57) to the Weight Tube (63) using a 5/16” x 1 3/4” Bolt (86) and a 5/16” Nylon Locknut (3).

13

19

 

 

 

 

 

7

50

 

 

 

 

 

 

6

 

23

 

47

 

 

 

21

 

 

48

 

20

 

 

 

 

 

55

Rod

 

 

 

 

20

 

 

 

81

 

 

 

23

 

 

21

 

23

 

 

 

 

 

74

40

9

 

 

 

40

 

21

 

 

 

 

9

 

55

 

8

 

 

 

Loop

 

 

22

 

 

 

 

23

 

 

 

57

78

 

 

 

86

 

3

 

 

 

2

 

63

 

 

Page 13
Image 13
Weider WESY19001 user manual Locknut. The Pulley Bracket must be able to pivot freely