FRAME ASSEMBLY

1.Press a 1 1/2” x 2 1/2” Outer Cap (73) onto each end of the Stabilizer (5). Press a 1 1/2” x 2 1/2” Inner Cap (27) into the indicated end of the Base (4).

Attach the Base (4) to the Stabilizer (5) using two 3/8” x 2 1/4” Carriage Bolts (1) and two 3/8” Nylon Locknuts (21). Make sure that the

Base is oriented exactly as shown.

2.Insert the Weight Guides (62) into the indicated holes in the Base (4) and the Stabilizer (5). Attach the Weight Guides to the Base and the Stabilizer using two 5/16” x 3 1/4” Bolts (14), two 5/16” Flat Washers (70), and two 5/16” Nylon Locknuts (3).

3.Attach the Front Upright (42) to the Base (4) using two 3/8” x 2 1/4” Bolts (1) and two 3/8” Nylon Locknuts (21). Do not tighten the

Nylon Locknuts yet.

4.Slide a Weight Bumper (19) down over each Weight Guide (62).

Slide the Weights (25) onto the Weight Guides (62). Make sure all of the Weights are ori- ented exactly as shown, with the deep pin grooves on the bottom.

1

21

 

 

 

 

 

 

 

 

4

 

5

 

73

 

 

 

 

73

1

27

 

 

 

 

 

2

 

 

 

 

 

62

 

14

70

5

 

 

 

 

 

 

70

 

 

3

 

 

3

 

 

 

 

4

3

 

 

42

 

 

 

 

 

 

21

 

 

4

 

 

 

 

1

4

 

 

 

 

62

 

Pin

 

 

 

 

 

 

Groove

25

 

 

 

19

 

 

8

Page 8
Image 8
Weider WESY19001 user manual Frame Assembly, Base is oriented exactly as shown, Nylon Locknuts yet