9.Insert the ends of two Weight Guides (42) into the indicated bracket on the Long Base (120). Attach the Weight Guides to the Long Base with a 3/8” x 6 1/2” Bolt (95) and a 3/8” Nylon Locknut (87).

Attach the other two Weight Guides (42) to the Long Base (120) in the same way.

10.Slide two Weight Bumpers (49) onto the two indi- cated Weight Guides (42). Next, slide ten Weights (44) onto the Weight Guides. Make sure that the

Weights are turned so the grooved sides of the Weights are facing downward.

Press a Weight Tube Bumper (48) into the lower end of a Weight Tube (43). Insert the Weight Tube into the centers of the Weights (44). Make sure that the Weight Tube is turned as shown.

Lubricate the two outer holes in a Top Weight (45). Slide the Top Weight onto the Weight Guides (42).

Make sure that the Top Weight is turned so the grooved side is facing downward.

Apply a number “10” decal to the Top Weight (45) in the location shown. Apply decals with the numbers 20 through 110 to the ten Weights (44).

Assemble the other weight stack in the same way.

11.Attach the Top Frame (6) between the Squat Upright (4) and the VKR Upright (5) with four 5/16” x 3 3/4” Bolts (92), the two Short Frame Plates (52), and two 5/16” Nylon Locknuts (86) as shown. Do not tighten the Bolts and Nylon Locknuts yet.

Attach the four Weight Guides (42) to the Top Frame (6) with two 3/8” x 6 1/2” Bolts (95) and two 3/8” Nylon Locknuts (87).

9

9

 

 

 

 

 

42

 

 

 

 

42

 

 

 

 

 

87

 

 

 

95

120

 

 

10

42

 

 

 

 

 

 

 

 

 

 

Lubricate

 

42

 

 

 

 

45

 

“10” Decal

 

43

 

 

 

 

48

44

 

 

 

 

 

“20” Decal

 

 

 

“110” Decal

 

 

49

Grooves

 

 

 

 

11

 

6

 

 

 

 

 

 

92

52

 

 

 

 

86

 

 

 

 

 

87

 

 

 

5

86

 

 

95

42

 

 

 

 

 

 

 

 

87

52

 

 

 

 

 

 

 

 

92

 

 

95

 

 

 

 

 

 

4

Page 9
Image 9
Weider WESY38320 user manual Assemble the other weight stack in the same way