
25.Identify the Upper Short Stack Cable (63). Attach the Cable inside the Top Frame (9) with an M10 x 65mm Bolt (80), two M10 Washers (99), and an M10 Nylon Locknut (101).
26.Wrap the Upper Short Stack Cable (63) under a 100mm Pulley (38). Attach the Pulley and a Long Cable Trap (68) to the indicated hole in a “U”- bracket (40) with an M10 x 50mm Bolt (81) and an M10 Nylon Locknut (101). Make sure the
Cable Trap is oriented to hold the Cable in the groove of the Pulley.
27.Route the Upper Short Stack Cable (63) up through the Top Frame (9) and over a 100mm Pulley (38). Attach the Pulley inside the Top Frame with an M10 x 65mm Bolt (80), two M10 Washers (99), two 12.5mm Spacers (69), and an M10 Nylon Locknut (101).
28.Route the Upper Short Stack Cable (63) over a 100mm Pulley (38) and down through the Top Frame (9). Attach the Pulley inside the Top Frame with an M10 x 65mm Bolt (80), two M10 Washers (99), two 12.5mm Spacers (69), and an M10 Nylon Locknut (101).
29.Set the tether on the other Weight Pin (98) over the Short Weight Tube (24). Set a 50mm Washer (95) on the Weight Tube.
Thread an M12 Nut (58) all the way onto the Upper Short Stack Cable (63). Screw the Cable partway into the Short Weight Tube (24). Tighten the Nut against the 50mm Washer (95).
25 |
|
99 | 9 |
101 |
|
| 99 |
63 | 80 |
| |
26 |
|
63 |
|
38 | 68 |
| |
| 81 |
101 | 40 |
| |
27 | 63 |
| |
| 9 |
101 | 38 |
| |
99 |
|
69 |
|
| 69 |
| 99 |
| 80 |
28 |
|
38 |
|
101 | 63 |
| |
99 |
|
69 |
|
9 | 69 |
| |
| 99 |
| 80 |
29 |
|
| 63 |
| 98 |
58 |
|
95 |
|
| 24 |
15