Weider WESY96400 high side of the brackets on the VKR, Upright and Leg Press Upright should be

Models: WESY96400

1 34
Download 34 pages 36.08 Kb
Page 6
Image 6
high side of the brackets on the VKR

FRAME ASSEMBLY

2. Slide the VKR Upright (74) and the Leg Press

2

 

27

Upright (56) onto the indicated 5/16” x 2 1/2”

 

 

27

Carriage Bolts (1) in the Stabilizer (5). The

 

 

 

 

 

high side of the brackets on the VKR

 

 

 

Upright and Leg Press Upright should be

 

 

 

on the side shown. Hand-tighten four 5/16”

 

87

 

Nylon Locknuts (3) onto the Carriage Bolts.

 

High Sides

 

 

Do not tighten the Nylon Locknuts yet.

 

91

of Brackets

 

 

 

Press two 2” Square Inner Caps (27) into the

 

74

 

 

 

56

Leg Press Upright (56). Press a 2” Square

 

 

 

27

 

Inner Cap into the VKR Upright (74).

 

 

Attach the Rubber Bumper (91) to the Leg

 

 

 

Press Upright (56) with the #8 x 1/2” Self-tap-

 

 

 

ping Screw (87).

 

 

 

 

 

3

 

 

 

 

5

 

 

 

1

 

 

1

 

3. Slide the Front Upright (42) onto the 5/16” x

3

 

 

2 1/2” Carriage Bolts (1) in the Base (4).

 

 

 

 

 

Hand-tighten a 5/16” Nylon Locknut (3) onto

 

 

 

each Carriage Bolt. Do not tighten the

 

 

 

Nylon Locknuts yet.

 

 

 

Press a 1” Square Inner Cap (6) into the

 

 

 

Front Upright (42).

 

 

 

 

 

 

42

 

 

 

6

 

 

 

3

 

 

4

 

 

 

 

1

6

Page 6
Image 6
Weider WESY96400 high side of the brackets on the VKR, Upright and Leg Press Upright should be, Nylon Locknuts yet