Manuals
/
Weil-McLain
/
Household Appliance
/
Boiler
Weil-McLain
550-110-260/0107
manual
Gold CGs Gas-Fired Induced-Draft Water Boiler
Models:
550-110-260/0107
1
3
64
64
Download
64 pages
7.9 Kb
1
2
3
4
5
6
7
8
Troubleshooting
Install
9b Operation wiring diagrams
Field wiring
Dimension
Section assembly
Check-out procedure checklist
Valve adjustment
Check pressure switch setting
Temperature gauges
Page 3
Image 3
GOLD CGs
Gas-Fired
Water Boiler — Boiler Manual
GOLD CGs
Gas-Fired
Induced-Draft
Water Boiler
Part number
550-110-260/0107
Page 2
Page 4
Page 3
Image 3
Page 2
Page 4
Contents
Gold CGs
How it works
Gold CGs Gas-Fired Induced-Draft Water Boiler
Contents
Installer
Please read before proceeding
User
1a Prepare boiler location codes & checklist
Installations must follow these codes
Before locating the boiler, check the following
1b Prepare boiler location clearances
Vent system
When removing boiler from an existing common vent system
1c Prepare boiler location vent system
CGs special vent system
Products to avoid
1d Prepare boiler location contamination
Sizing air openings
1e Prepare boiler location air openings
Combustion air options
Special considerations
Sizing air openings for CGs installations
Inspect orifices and burners
2a Prepare boiler placement & setup
Orifice replacement procedure
Place boiler/crate near position
Prepare boiler for test
2b Prepare boiler pressure test
Hydrostatic pressure test
Drain and remove fittings
3a Water piping general information
3b Water piping single-zone system
Systems
3c Water piping multiple zones
Piping multiple zones Piping for radiant heating
Systems or converted gravity
Return water 130F or higher
Primary/secondary preferred bypass piping method
Temperature gauges
Valve adjustment Figures 8 and 9 only
3d Piping low temp systems
Primary/secondary piping
BOILER-bypass piping method
Valve adjustment
Figures 8
SYSTEM-bypass piping method
Prevent chilled water from entering
3e Water piping refrigeration systems
Venting and combustion air
Propane Gas
Connecting gas supply piping to boiler
Gas piping
Natural Gas
Thermostat
Field wiring
Electrical installation must comply with
Wiring connections
Verify water chemistry
Freeze protection when used
7a Start-up preparation
Check for gas leaks
Start the boiler
7b Start-up operate boiler
Inspect system water piping Inspect base insulation
Final check before starting boiler
Pilot burner flame Figure
7c Start-up if boiler doesn’t start
Check burner flames
Check for
Installation and service certificate
Check-out procedure checklist
9a Operation sequence
Schematic wiring diagram
9b Operation wiring diagrams
Ladder wiring diagram
9c Operating instructions CGs-3 to CGs-6
9c Operating instructions CGs-3 to CGs-6
9c Operating instructions CGs-3 to CGi-6
Verify Proper Operation After Servicing
10a Service and maintenance schedule
10b Service & maintenance annual start-up
Oiled-bearing circulators
Burners, base and inlet air box
Condensate drain system
Inducer motor
10b Service & maint. annual start-up
Relief valve, typical
Boiler relief valve
Review with owner
Cleaning boiler heating surfaces
11a Troubleshooting procedure
Before troubleshooting
Check the following
Troubleshooting air pressure reading
11b Troubleshooting air pressure switch
Air pressure switch
Check pressure switch setting
Troubleshooting the control module
11c Troubleshooting control module
Control indicator lights Lockout modes
Control indicator lights NON-LOCKOUT modes
Control module connections
Chart 1 Troubleshooting Power light status
11d Troubleshooting control module lights
Chart 2 Tstat Circ & Power lights flashing
Chart 3 Press Switch & Power lights flashing
Chart 4 Flame & Power lights flashing
Item 8 ,
Does blower motor operate?
Verify Sequence of operation, ,
Section assembly Base Jacket Trim Controls
12a Replacement parts
Section assembly
12b Replacement parts section assembly
Base assembly
12c Replacement parts base
Description Weil-McLain Part number
Jacket assembly
12d Replacement parts jacket
Boiler Model Weil-McLain part number
Part number
12e Replacement parts trim
Propane gas components
12f Replacement parts controls
Dimensional drawing
13a Dimensions
DOE
13b Ratings
Removal of Combustion Chamber Lining or Base Panels
Handling ceramic fiber and fiberglass materials
Top
Page
Image
Contents