Weil-McLain 550-110-260/0107 Gas piping, Connecting gas supply piping to boiler, Natural Gas

Models: 550-110-260/0107

1 64
Download 64 pages 7.9 Kb
Page 25
Image 25
5 Gas piping

GOLD CGs Gas-Fired Water Boiler — Boiler Manual Connecting gas supply piping to boiler

5 Gas piping

Connecting gas supply piping to boiler

1.Remove jacket front panel and refer to Figure 14 to pipe gas to boiler.

a.Install drip leg at inlet of gas connection to boiler. Where local utility requires drip leg to be extended to the floor, use appropri- ate length of pipe between cap and tee.

b.Install ground joint union for servicing, when required.

c.Install manual shutoff valve in gas supply piping outside boiler jacket when required by local codes or utility requirements.

d.In Canada — When using manual main shutoff valve, it must be identified by the installer.

2.Support piping with hangers, not by boiler or its accessories.

3.Purge all air from gas supply piping.

4.Before placing boiler in operation, check boiler and its gas connection for leaks.

a.Close manual main shutoff valve during any pressure testing at less than 13” w.c.

b.Disconnect boiler and gas valve from gas supply piping dur- ing any pressure testing greater than 13” w.c.

Do not check for gas leaks with an open flame

use bubble test. Failure to use bubble test or check for gas leaks can cause severe personal injury, death or substantial property damage.

5.Use pipe dope compatible with propane gases. Apply sparingly only to male threads of pipe joints so that pipe dope does not block gas flow.

Failure to apply pipe dope as detailed above can result in severe personal injury, death or substantial property damage.

Natural Gas:

1.Refer to Table 4 for pipe length and diameter. Base on rated boiler input (divide by 1,000 to obtain cubic

feet per hour). Table 4 is only for gas with specific gravity 0.60, with a pressure drop through the gas piping of 0.30” w.c. For additional gas pipe sizing information, refer to ANSI Z223.1 (or B149.1 or B149.2 for Canadian installations).

2.Inlet pressure required at gas valve inlet:

Maximum: 13” w.c.

Minimum: 5” w.c.

Manifold gas pressure: 3.5” w.c.

3.Install 100% lockup gas pressure regulator in supply line if inlet pressure exceeds 13” w.c. Adjust for 13” w.c. maximum.

Propane Gas:

1.Contact gas supplier to size pipes, tanks and 100% lockup gas pressure regulator.

2.Adjust propane supply regulator provided by gas supplier for 13” w.c. maximum pressure.

3.Inlet pressure required at gas valve inlet:

Maximum: 13” w.c.

Minimum: 11” w.c.

Manifold gas pressure: 10” w.c.

Table 4  Pipe capacity for 0.60 specific gravity natural gas

Figure 14  Gas supply piping

Part number 550-110-260/0107

25

Page 25
Image 25
Weil-McLain 550-110-260/0107 manual Gas piping, Connecting gas supply piping to boiler, Natural Gas, Propane Gas