5. Have a second person lift and hold the front end
of the Frame (61). Hold an UprightSpacer (88)
betweenthe Right Upright (87) andthe Frame.
Attachthe Right Upright to the Frame with an
M10 x 110mmBolt (1), an M10 Washer (12), and
an M10Star Washer (11). Do not tighten the
Boltyet.
Repeatthis step on the left side of the tread-
mill.
5
61
1
87
88
12
11
4. Withthe help of a second person, raise the
Uprights (86, 87) so the Base (91) is flat on the
floor as shown. Next, positionthe front of the
Frame(61) between the Uprights.
See the inset drawing. Locate the wire tie in-
side of the lower end of the Right Upright (87).
Secure the wire tie to the Wire Harness (83).
Then, pull the upper end of the wire tie until the
end of the Wire Harness is extending from the
upper end of the Right Upright.
4
91
87
61
86
83 8387
Wire
Tie