INSTALLATION INSTRUCTIONS
2

Inspection and Shipping Claim

Check for shipping damage upon receipt of the spa. Jacuzzi Whirlpool Bath is not responsible for damage to the
spa sustained during shipping. If damage is evident before unpacking, see instructions regarding shipping claims on
the outside of the carton and immediately file a claim with the carrier.
Once the spa has been removed from the carton and before it is permanently installed (see below on this page for
unpacking instructions), check the spa completely for damage. Fill the shell with water and operate the system (see
Operating Instructions) to check for leaks which may have resulted from shipping or handling. All Jacuzzi Whirlpool
Bath spas are factory tested for proper operation and water tight connections prior to shipping. If leaks or other
problems are detected, immediately notify your Jacuzzi Whirlpool Bath dealer or Authorized Service Agent, or call
Jacuzzi Whirlpool Bath, (510) 938-7411 or, (510) 938-7070 for Warranty Service.
Note: Damage or defects which could have been discovered and repaired prior to installation and which are claimed
after final installation of the spa, are excluded from our warranty.

Unpacking

1. Remove sides and top of crate, as well as plastic
bags, leaving pallet intact.
2. Check for shipping damage. Register damage
claim with carrier. See Notice on this carton.
3. Remove and set aside unattached cartons and
accessory pieces.
4. Move spa to final site with pallet still attached as
shown. (See note below if spa must be moved
after pallet has been detached.)
CAUTION: DO NOT CUT OR REMOVE THE
FOUR BANDS OR THE BOLTS THAT SECURE
THE PALLET TO THE SPA UNTIL AFTER THE
SPA HAS BEEN TIPPED OVER.
5. Place a 4"x4"x72" wooden block beside the pan
side of the spa so it is parallel with the pallet.
6. Tip the spa over onto its bottom with block support-
ing the spa.
7. Remove brackets and bolts securing the pallet to
the spa.
8. Remove the pallet and the 4"x4" block, then care-
fully lower the spa to a horizontal position.
9. Attach the skirt panel according to instructions in-
cluded with the skirt panel.
Note: If the pallet must be detached before the spa is
moved, detach it as instructed above, but do not attach
the skirt panel; see below.
10. Locate area where reinforcement has been in-
stalled.
11. Place spa on dolly so only reinforced area contacts
the dolly for adequate support. The spa must not
lie on its skirt.
12. Attach skirt panel after moving spa to final location.
Important! Read all the instructions contained in
the Owner's Manual before beginning installation.
STRAPPING (4)
4" X 4" X 72" BLOCK
SUPPORT
REMOVE
BOLTS
SECURING
PALLET
SPA RIM
SPA PAN
PALLET
DOLLY
REINFORCED AREA
(FOR MOVING SPA
WITHOUT PALLET)
4"X 4" X72" BLOCK
BANDING
INSTALLATION