INSTALLATION INSTRUCTIONS
Unpack the Air Conditioner
WARNING
Excessive Weight Hazard
Use two or more people to move and install air conditioner.
Failure to do so can result in back or other injury.
Remove packaging materials
■Remove and properly dispose of packaging materials. Remove tape and glue residue from surfaces before turning on the air conditioner. Rub a small amount of liquid dish soap over the adhesive with your fingers. Wipe with warm water and dry.
■Do not use sharp instruments, rubbing alcohol, flammable fluids, or abrasive cleaners to remove tape or glue. These products can damage the surface of your air conditioner.
Install side curtains
NOTE: Attach curtains to unit before placing unit in window.
1.Insert curtain into curtain frame.
2.Push curtain in all the way.
3.Pull curtain toward open end of curtain frame.
Prepare Air Conditioner for Installation
■Handle air conditioner with care.
■ Be sure your air conditioner does not fall out of the opening during installation or removal.
■The place where the power cord exits the air conditioner
should be no more than 4 ft (122 cm) from a grounded outlet.
1.Locate provided bags of screws.
2. Place the top channel on top of the air conditioner, lining up the holes in top channel with the holes on top of air conditioner.
3.Using 3 - #10 x ³⁄₈ in.
| 4. | Locate provided bag of 6 - #8 x ³⁄₈ in. |
1 | 2 | Insert top and then bottom of |
5. |
and bottom curtain guides on air conditioner.
1. Top channel
2. #10 x ³⁄₈ in.
5