INSTALLATION
TABLE 1
Type | Existing | Replacement | |
| Control Board | Control Board | |
| COOL | ||
| HEAT | ||
| PARK (2) | PARK (2) | |
L1 | EAC | ||
120 VAC | LINE | ||
| XFMR | ||
| HUM | ||
| NONE | FAN | |
|
| ||
Neutral | Neutral | ||
120 VAC | |||
120 VAC | |||
(5) | |||
| |||
|
| ||
Flame Sense | E33 | FS |
PROCEDURE 2
REPLACING 24L8501,
over the marks. Use the mounting panel as a template to drill 3/16" holes through each of the holes marked "A". Install the replacement control in the freshly drilled holes in the blower access panel.Use aluminum tape to seal the unused holes.
B. When replacing original 63K8901 board in |
downflow applications – Look at the existing |
control board holes as if the unit were installed |
in the upflow position. Make a mark 5/8" |
ABOVE each of the existing mounting holes. |
Position the provided mounting panel so that |
the holes marked "C" in figure 1, page 3 are |
over the marks. Use the mounting panel as a |
template to drill 3/16" holes through each of |
the holes marked "A". Install the replacement |
control in the freshly drilled holes in the blower |
access panel. Use aluminum tape to seal the |
unused holes. |
C. All other units – Position the provided |
mounting panel so that the arrow on the |
front of the panel is pointing up. Position the |
replacement |
over the holes marked "A" in figure 1, page 3. |
Mounting panel
Wiring harness
Optional 4" blue wire to connect to Transformer (TH)
Wiring harness
GND
Transformer
Circuit breaker in series between Pin 3 and Trans- former (TH)
Insert the replacement control |
fasteners into the holes in the mounting panel. |
80UHG, 90UGF, G23, G26, GHR26, G32, |
GHR32, G40, G41, G50, G51, G60 and G61 |
units – Insert the four provided |
fasteners into the back of the mounting panel in |
the holes marked "B" in figure 1. 80MGF, G24M |
and G27M units – Insert the four provided |
panel into the holes marked "C" in figure 1. |
Insert the replacement control board assembly |
into the existing holes in the control box or |
blower panel. |
5. Insert provided circuit breaker in series between |
the blue wire on Pin 3 of the wiring harness |
to |
4" blue wire provided for transformers that have a |
6. Connect the provided |
Photo 2
1.Disconnect all electrical power and shut off the gas supply to the furnace.
2.Remove the access panel.
3.Disconnect wiring and remove existing ignition control board from the control box.
4.A. When replacing original 63K8901 board
| harness to the unit |
7. | Connect the provided |
| to the unit |
8. | Connect the yellow wire from position 6 on the 12- |
| pin connector to the yellow transformer wire. |
9. | Connect GND wire to equipment ground. |
10. | Connect the remaining 120 VAC hot and neutral |
| wires and the flame sense wire to the replacement |
4
in upflow or horizontal applications or downflow applications – Look at the existing control board holes as if the unit were installed in the upflow position. Make a mark 1" to the
right of each of the existing mounting holes. Position the provided mounting panel so that the holes marked "C" in figure 1, page 3 are
| control per table 2, page 5 . |
11. | Affix wiring diagram |
| existing unit wiring diagram |
12. | Replace the access panel. |
13. | Restore the electrical power and gas supply. Refer |
| to the furnace installation instructions for |
| and |