MAINTENANCE

M1001 6" x 26" Vertical Mill

Maintenance Schedule

Daily:

Pump handle of the one shot lubrication system 2-4 times.

Clean machine to remove debris.

Make sure table/vise is clean and free of metal chips.

Clean spindle openings before inserting tools.

Check for any unsafe conditions.

Weekly:

Place five drops of oil on the drawbar splines.

Thoroughly clean the machine ways to remove chips and debris.

Clean and grease the longitudinal, cross, and knee lead screws.

Monthly:

Clean/vacuum dust buildup from the motor.

Check mill for level, correct if necessary.

Every Six Months:

Inspect belts for wear, and replace as needed.

Maintenance Notes

 

 

 

 

DATE

MAINTENANCE PERFORMED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

-28-

Page 30
Image 30
Woodstock M1001 manual Maintenance Schedule, Maintenance Notes