-28-
M1001 6" x 26" Vertical Mill
MAINTENANCE
Maintenance NotesMaintenance Schedule
Daily:
Pump handle of the one shot lubrication system 2-4 times.
Clean machine to remove debris.
Make sure table/vise is clean and free of metal chips.
Clean spindle openings before inserting tools.
Check for any unsafe conditions.
Weekly:
Place five drops of oil on the drawbar splines.
Thoroughly clean the machine ways to remove chips and debris.
Clean and grease the longitudinal, cross, and knee lead screws.
Monthly:
Clean/vacuum dust buildup from the motor.
Check mill for level, correct if necessary.
Every Six Months:
Inspect belts for wear, and replace as needed.
DATE MAINTENANCE PERFORMED