INSTALLATION
To conform to NEC regulations, certain branch circuits must be equipped with a Ground Fault Circuit Interrupter (GFCI). Please consult the code or a qualified electrician for details. Any such branch circuits must be protected by a brand rated circuit breaker consistent with the GFCI rating. Underwriters Laboratories has tested the following GFCI, and its use is recommended. Receptacle Type:
Pass & SeymourCatalog Number 1591Rated: 15 Amps at 120 Volts ACRemote Control WiringIf installing a remote panel, route the remote cable and connect to the Remote jack on the front of the unit. Refer to the Remote Control Panel Owner’s Manual for more information.
TSC Temperature SensorIf installing the TSC (Temperature Sensitive Charging) sensor, connect the ring terminal end to the positive battery post, complete the routing of the RJ11 cable (15 feet supplied) and connect the plug end to the TSC jack on the front of the unit.
DC wiring is generally very
High current will pass through the DC wiring. All wires must be properly sized and all connections clean and tight. It is recommended that the battery cable length does not exceed 10 feet.
Battery cables should be connected to the inverter/charger before any connections are made to the battery. Follow the battery hardware stackup diagram.
•Remove the negative
180
|
| Battery Cable | Bolt | |
|
| Hardware Stackup | Lock Washer | |
TSC Jack | RJ11 Cable | Diagram | ||
Flat Washer | ||||
|
|
| ||
|
| Battery | Battery Cable | |
|
|
| ||
|
|
| Inverter/Charger |
WARNING
The