Installation

To make PV Array #1 and GT100E #1 connections:

1.Route the PV Array #1 cables through the access panel and connect the cables to PV ARRAY #1 PV(+) and PV(-) terminals, see Figure 2- 5.

2.Route the GT100E #1 cables through the access panel and connect the cables to GT100E #1 PV(+) UNIT and PV(-) terminals, see Figure 2- 5.

3.Route the PV Array #1 ground cable through the access panel and connect the cable to PV ARRAY #1 GND terminal, see Figure 2-5.

Combiner Box

Combiner Box

Combiner Box

Combiner Box

Combiner Box

PV ARRAY #1

PV ARRAY #1

PV ARRAY #1

GT100E #1

GT100E #1

GND Terminal

PV (+) Terminal

PV (-) Terminal

PV (+) Terminal

PV (-) Terminal

Figure 2-5PV Array #1 and GT100E #1 Connections

2–8

152602

Page 24
Image 24
Xantrex Technology owner manual To make PV Array #1 and GT100E #1 connections, 5PV Array #1 and GT100E #1 Connections