Cable Installation

To make PV Array #2 and GT100E #2 connections:

1.Route the GT100E #2 cables through the access panel and connect the cables to GT100E UNIT #2 PV(+) and PV(-) terminals, see Figure 2- 6.

2.Route the PV Array #2 cables through the access panel and connect the cables to PV ARRAY #2 PV(+) and PV(-) terminals, see Figure 2- 6.

3.Route the PV Array #2 ground cable through the access panel and connect the cable to PV ARRAY #2 GND terminal see Figure 2-6.