Indoor Unit Fixing

Thread the indoor unit piping and cable through the hole.

Hang the top of the unit onto the upper ridge of them in mounting plate.

Make sure that the unit is correctly hung in place by sliding it to the left, then to the right.

Press the bottom left and bottom right hand corners of the unit against the mounting plate until the fixing prongs click into place in the retainers provided to that effect.

Drainage line

a

 

 

a) Access plate for the

 

 

Condensate

 

condensate drainage

Interconnection cable

 

 

pump detection

 

drainage line

 

 

 

Vinyl tape

(condensate pump is

 

 

 

 

 

 

available as an

 

 

 

 

 

 

 

 

accessory).

Note: The condensate evacuation line should be taped to the refrigerant lines with vinyl tape.

OUTDOOR UNIT

Fixing and Piping

Piping must be performed by qualified personnel according to good refrigeration systems practices.

Piping materials and insulation materials must be of refrigerant quality.

Select the pipe diameters according to the size of unit and cut the pipe to design length by using pipe cutter.

Install the flare nuts and flare the end of the pipes.

Check that no foreign bodies are inside the piping.

Align the central of the connecting pipes and tighten the flare nut.

Fix piping with pipe clamps and check that any pipe vibrations cannot be transmitted to the building structure.

NOTES

Connect the pipe correctly.

Do not apply the excessive torque.

Use an appropriate bending tool to form curves and avoid over-tightening the refrigerant tubes.

To prevent heat loss, the two lines must be insulated separately.

Maximum Piping Length

Unit size

 

 

MODELS

 

 

7

9

 

12

 

18

24

 

 

 

(m)

10

10

 

10

 

15

15

The suction line must have a 2% gradient up to the compressor on horizontal sections.

Where piping lengths are unusually long and include a large number of oil traps, it may be necessary to adjust to compressor charge.

Refrigerant charge to be added per extra meter of piping length when more than 7.5 meters.

Unit size

 

 

MODELS

 

 

7

9

 

12

 

18

24

 

 

 

g/m

15

15

 

15

 

40

40

Refrigerant piping connections (FLARE connections)

To avoid alteration of unit capacities, check that piping lengths and changes in elevation are kept to a strict minimum.

Before connectiong the refrigerant lines, follow the procedures below (if pre-charged connection lines are not supplied):

-Select copper pipe diameters according to the size of unit to be installed.

-Install the refrigeration lines, checking that no foreign boodies get inside the piping.

-Install the flare connectors and flare the ends of the pipes.

-Evacuate the piping. This operation, which should last

at least 15 minutes if there are large piping lengths and changes in elevation, should be followed by a leak test.

10ENGLISH

J199.pmd

10

31/03/2005, 9:54 PM

Page 10
Image 10
York MLCA-MLHA-07-24 owner manual Outdoor Unit, Indoor Unit Fixing, Fixing and Piping, Maximum Piping Length

MLCA-MLHA-07-24 specifications

York MLCA-MLHA-07-24 is a high-efficiency, cutting-edge variable refrigerant flow (VRF) system designed for both commercial and residential applications. This air conditioning solution embodies the latest advancements in HVAC technology, presenting significant energy-saving capabilities, versatile installation options, and enhanced user comfort.

One of the standout features of the York MLCA-MLHA-07-24 is its advanced inverter compressor technology. This technology allows the system to adjust its cooling or heating output based on the specific demands of the space, ensuring optimal energy use and maintaining desired indoor temperatures. By varying the compressor speed, the unit minimizes wear and tear on components, leading to a longer operational lifespan and reduced maintenance needs.

Another key characteristic of the MLCA-MLHA-07-24 is its multi-zone capability, which allows for efficient climate control in multiple rooms or areas. This flexibility permits individual temperature settings for different spaces, enhancing comfort for occupants while optimizing energy consumption. The system can support several indoor units connected to a single outdoor unit, making it ideal for various building layouts and sizes.

In terms of efficiency, the York MLCA-MLHA-07-24 boasts an impressive SEER (Seasonal Energy Efficiency Ratio) rating, which is indicative of its ability to cool spaces with minimal energy use. This promotes not only lower utility bills for end users but also contributes to a reduced carbon footprint, making it an environmentally friendly option in HVAC systems.

The system is also designed with quiet operation in mind. It features sound-dampening technologies that significantly lower noise levels, making it suitable for use in noise-sensitive environments. This is particularly beneficial in commercial settings such as offices, restaurants, and healthcare facilities where a peaceful atmosphere is essential.

Furthermore, the MLCA-MLHA-07-24 incorporates advanced controls with smart technology compatibility. Users can easily manage their indoor climate through mobile apps or smart home systems, providing convenience and the ability to monitor energy usage in real-time. This capability is rapidly becoming a necessity as energy management and sustainability become more significant priorities for consumers and businesses alike.

In conclusion, the York MLCA-MLHA-07-24 represents a synthesis of innovation, efficiency, and user-friendly operation. Its key technologies and characteristics make it a prime choice for those seeking to enhance their indoor environments through sophisticated HVAC solutions that prioritize comfort, sustainability, and convenience.