
OPERATIONS
STEP 4: POWER UP TRANZSTOR 8X
Before powering the TranzStor 8X, make sure all of the connections are tightened securely at the rear of the unit.
Then press the power switch on the front of the 8X.
Power Switch, Front
After turning on the power switch, the controller will beep. Watch the amber activity lights. All of the drives’ activity LEDs will illuminate briefl y, and then extinguish.
STEP 5: ESTABLISH
SERIAL CONNECTION
From Accessories/Comunications/ select Hyperterminal. Create description, select COM Port and fi ll in Port Settings as follows:
•Bits per seconds: 38400
•Data bits: 8
•Parity: None
•Stop bits: 1
•Flow control: None
13
Doc#