1.

If possible, disconnect and move freestanding or

 

 

 

slide-in range from cabinet opening to provide easier

 

 

access to rear wall. Otherwise put a thick, protective

 

 

covering over countertop, cooktop or range to

 

 

protect from damage or dirt. Select a flat surface for

 

 

assembling the unit. Cover that surface with a

 

 

protective covering and place all canopy hood parts

 

 

and hardware in it.

 

2.

Determine and mark the centerline on the wall where

 

 

the canopy hood will be installed.

 

3.

Select a mounting height comfortable for the user

 

 

and mark on wall behind cooktop.

 

4.

Tape template, matching center-line and hood

 

 

bottom as shown in Figure below.

 

5.

Place the lower support bracket on the template

 

 

making it coincide with the traced triangle, mark

 

 

center of two fastener location and one lower

 

 

fastener location then remove template.

centerline

fasteners

C

 

locations

lower

 

L

 

 

support

 

 

bracket

mounting height reference

6.Mark wall with horizontal line 1" above highest and 1" below lowest fastener location.

7.Find studs behind drywall by tapping wall or using a stud finder. Mark the center of the studs with a vertical line to the right and left of the marked fastener location.

8.Note: all fastener location must span the studs otherwise proceed as follows:

Cutout drywall along marked lines. Install each necessary between studs firmly flush with already existing stud front. Make sure all mounting screws will anchor to added studs. Replace drywall and refinish.

9.Determine and make all necessary cuts in the wall for the vent system. Install the vent system before the canopy hood. See „Venting methods“ and „Dimensions and clearance“ paragraphs.

Note - for Ductless - recirculating - installations: Vent system is not required.

10.Determine the required height for the conduit and cut a 1-1/4" (3.2 cm) hole at this location.

Run wires through hole according the National Electrical Code or CSA Standards and local codes and ordinances.

Note: If a In-line blower installation is required/ needed, then provide an additional hole/conduit.

There must be enough power supply cable from the fused disconnect (or circuit breaker) box to make the connection in the hood’s Junction box/es.

Use caulking to seal all openings.

Do Not turn on power until installation is completed.

11.Remark center line and hood bottom on same location as before and tape template on wall as in step 4 above.

12.Mount the lower support bracket with wood screws (supplied in mounting hardware kit) on locations marked on template, then remove template.

13.Install duct cover support bracket to wall flush to ceiling with drywall anchors supplied (the duct cover support bracket should be installed about 1/8“ (3mm) away from the ceiling).

For Ductless (recirculating) installations

Install the deflector (available as an extra kit) under the duct cover support bracket.

14.Note: disregard this step if intending to install a in- line blower.

Purchase and install the Internal blower (see paragraph „Before installing the hood - Parts not supplied“ for model reference).