Zephyr EBO-E36ASX, EBO-E42ASX manual Installation Ductwork Calculation Sheet

Models: EBO-E42ASX EBO-E36ASX

1 22
Download 22 pages 23.2 Kb
Page 9
Image 9

www.zephyronline.com

Duct pieces

Equivalent number

 

 

lenght x used

=

Total

3 1/4 ” x 10”

1 Ft.

x (

) =

Ft.

Rect.,

 

 

 

 

straight

 

 

 

 

6 ” Round,,

1 Ft.

x (

) =

Ft.

straight

 

 

 

 

7", 8”

1 Ft.

x (

) =

Ft.

Round,,

 

 

 

 

straight

 

 

 

 

3 1/4 ” x 10”

15 Ft.

x (

) =

Ft.

Rect.90°

 

 

 

 

elbow

 

 

 

 

3 1/4 ” x 10”

9 Ft.

x (

) =

Ft.

Rect.45°

 

 

 

 

elbow

 

 

 

 

3 1/4 ” x 10”

24 Ft.

x (

) =

Ft.

Rect.90°

 

 

 

 

flat elbow

 

 

 

 

3 1/4 ” x 10”

30 Ft.

x (

) =

Ft.

Rect.

 

 

 

 

wall cap

 

 

 

 

with damper

 

 

 

 

3 1/4 ” x 10”

5 Ft.

x (

) =

Ft.

Rect.to

 

 

 

 

6 ” round

 

 

 

 

transition

 

 

 

 

3 1/4 ” x 10”

15 Ft.

x (

) =

Ft.

Rect.to

 

 

 

 

6 ” round

 

 

 

 

transition

 

 

 

 

90° elbow

 

 

 

 

6 ” Round,,

15 Ft.

x (

) =

Ft.

90° elbow

 

 

 

 

6 ” Round,,

9 Ft.

x (

) =

Ft.

45°elbow

 

 

 

 

 

Subtotal column 1

=

Maximum Duct Length: For satisfactory air movement, the total duct length should not exceed 100 equivalent feet.

Duct pieces

Equivalent number

 

 

lenght x used

=

Total

6" Round

30 Ft.

x (

) =

Ft.

wall cap

 

 

 

 

with damper

 

 

 

 

6” Round,

30 Ft.

x (

) =

Ft.

roof cap

 

 

 

 

6” Round to

1 Ft.

x (

) =

Ft.

3 1/4 ” x 10”

 

 

 

 

rect.

 

 

 

 

transition

 

 

 

 

6” Round to

16 Ft.

x (

) =

Ft.

3 1/4 ” x 10”

 

 

 

 

rect.

 

 

 

 

transition

 

 

 

 

90° elbow

 

 

 

 

7", 8" round

15 Ft.

x (

) =

Ft.

90° elbow

 

 

 

 

7", 8" round

9 Ft.

x (

) =

Ft.

45° elbow

 

 

 

 

7", 8" Round

30 Ft.

x (

) =

Ft.

wall cap

 

 

 

 

with damper

 

 

 

 

7", 8"

30 Ft.

x (

) =

Ft.

Round,

 

 

 

 

roof cap

 

 

 

 

7” Round to

8 Ft.

x (

) =

Ft.

3 1/4 ” x 10”

 

 

 

 

rect.

 

 

 

 

transition

 

 

 

 

6” Round to

15 Ft.

x (

) =

Ft.

3 1/4 ” x 10”

 

 

 

 

rect.

 

 

 

 

transition

 

 

 

 

90° elbow

 

 

 

 

 

Subtotal column 2

=

 

Subtotal column 2

=

 

Total ductwork

 

=

Installation - Ductwork Calculation Sheet

9

Page 9
Image 9
Zephyr EBO-E36ASX, EBO-E42ASX manual Installation Ductwork Calculation Sheet