Zephyr ZVE-E36S Hood & Duct Cover, Mounting The Duct Cover, Duct Cover Bracket, 9-7/16, 10-3/8

Models: ZVE-E42S ZVE-E36S ZVE-E30S

1 19
Download 19 pages 58.46 Kb
Page 10
Image 10
Hood & Duct Cover

Hood & Duct Cover

www.zephyronline.com

1. Measure from range top to hood bottom

C/L

(28” min) Level and mark line A.

 

2. Plum and mark center line.

 

Duct Cover Bracket

3.Mark mounting height line B. (10-3/8” from line A)

4.Mark mounting spread from C/L (9-7/16”)

 

 

9-7/16"

5.

Fasten E-Z anchors to wall (see below) as marked.

B

6.

Fasten screws provided onto EZ anchors, do not

10-3/8"

 

fasten screws all the way.

A

7. Hang hood onto screws and hand tighten (fig A).

the

MOUNTING THE DUCT COVER

28" min Duct Cover Bracket

C/L

Installation - Mounting

1. Center and attach duct cover mount bracket on wall below ceiling or soffit.

2. Mount telescopic duct covers onto hood and extend inner duct cover and fasten to bracket.

fig. A

EZANCHORS

Tap EZ anchor tip into marked drywall locations, turn with screw- driver until seated flush.

Note:whenever possible, the hood should be secured to wall studs.

Use EZ anchors only on hollow drywall applications (minimum drywall thickness 1/2”). If a stud or wood surface is present, fasten screws directly into stud or plywood. For all other wall types (concrete, brick, tiles, etc), use appropriate anchors for mounting.

8

Page 10
Image 10
Zephyr ZVE-E36S, ZVE-E30S Hood & Duct Cover, Mounting The Duct Cover, Duct Cover Bracket, 9-7/16, 10-3/8, 28 min, fig. A