Snapper 2137 manual Hydraulic System Diagram

Page 10

Hydraulic System Diagram

Dozer Hydraulic System

Without Auxiliary

Hydraulic Lift Kit

Dozer

 

Angling

 

Cylinder

 

Female

Male

1718590 1/2 x 28"

1718416 1/2 x 75"

To Power

Steering

From Power

Steering

IN

OUT

B

BYD

A

 

1718411

23/32 x 17" Threads

Hex Fitting

Hose

ClampBeaded 1718413 End 5/8 x 9"

Hose Clamp

“T” Connector

Tractor

Front

Male Female

1718415 23/32 x 40"

Female Male

Male Female

Metal

Crossover

Tubes

 

 

 

 

 

 

IN

 

OUT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Control Valve

Master Valve

To Hydro Pump

Dozer Hydraulic System

With Auxiliary Hydraulic

Lift Kit Installed

Dozer

Angling

Cylinder

1718590 1/2 x 28"

1718416 1/2 x 75"

Female Male

To Power

Steering

From Power

Steering

IN

OUT

B

BYD

1718411

23/32 x 17" Threads

Hex Fitting

Hose

ClampBeaded 1718413 End 5/8 x 9"

Hose Clamp

Tractor

Front

Male Female

1718415 23/32 x 40"

Female Male

Male Female

Metal

Crossover

Tubes

1718442 1/2 x 69"

 

 

 

 

 

 

IN

 

OUT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Control Valve

A

“T” Connector

1718417 1/2 x 67"

Master Valve

 

 

 

Lift Cylinder

To Hydro Pump

8

Image 10
Contents OPERATOR’S Manual Hydraulic Angling Dozer Blade AttachmentPage Table of Contents Safety Rules General WarningsAttachment Lift Angling Control LeverTwo-Speed Control Engine & Ground Speed Selection OperationChecks Before Starting TransportingStorage Schedule For Normal Care MaintenanceLubricate Dozer Blade Troubleshooting Problem Possible Corrective Cause ActionHydraulic System Diagram Dozer Hydraulic System Without Auxiliary Hydraulic Lift KitLift Height Adjustment AdjustmentsSkid Shoe Adjustment Downward Pressure AdjustmentAttach Dozer Lift Arm Initial Assembly & InstallationAssemble Dozer Blade Install Rear Hitch Mounting Brackets Install Front Hitch Mounting BracketsFront Install Hitch Onto Tractor Initial Assemble & InstallationInstall Attachment Lift Extension Install Lift RodInstall Dozer Blade Install New Master Valve Old Master Valve Foam Screw Hair Pin Clip Actuator ArmInstall Cross-Over Tubes HolesAssemble Control Arm Install Bypass Hose & T-ConnectorViewed From Right Side Install Control Valve Assemble Control ValveTo Front Cross- Over Tube To Back Cross Install Hydraulic Cylinder On Dozer Blade Connect Hydraulic Hoses 2 Control Valve HosesAssemble Bypass Hose Dozer & Hitch Removal Normal Installation Remove Bypass Hose Hardware Identification & Torque Specifications