Snapper 2137 manual Install Dozer Blade

Page 15

Install Dozer Blade

1.Fully lower the attachment lift.

2.See Figure 15. Attach the dozer to the tractor by resting the dozer pins (A) on the front attachment hooks (C).

3.See Figure 15. Install two clevis pins (B) on both sides and secure with safety clips.

4.See Figure 16. Attach the dozer lift arm (B) to the hitch lift arm (E) using a clevis pin and safety clip.

NOTE: At this point during initial installation tighten the capscrews (C, Figure 10) securing the rear hitch mount- ing brackets. This is only necessary when installing the attachment for the first time.

Initial Assembly & Installation

A

B

C

Figure 15. Attach Dozer

A. Dozer PinsC. Attachment Hooks B. 5/8 x 1-5/8” Flat Head Clevis Pin

A

C

 

 

 

 

 

 

H

 

G

E

D

F

 

 

 

 

 

 

 

 

 

 

I

C

J

 

 

 

B

 

 

 

 

 

 

 

Figure 16. Lift Rod

A. 1/2 x 1-1/2” Round Head F. Lift Rod

Clevis Pin

G. Front Hitch Bracket

B. Dozer Lift Arm

H. Lift Extension

C. Safety Clip

I.

5/8 x 1-5/8” Flat Head

D. Ladder Hitch

 

Clevis Pin

E. Hitch Lift Arm

J. 1/2 x 2” Flat Head

 

 

Clevis Pin

13

Image 15
Contents Hydraulic Angling Dozer Blade Attachment OPERATOR’S ManualPage Table of Contents General Warnings Safety RulesAngling Control Lever Attachment LiftTwo-Speed Control Transporting OperationChecks Before Starting Engine & Ground Speed SelectionStorage Maintenance Schedule For Normal CareLubricate Dozer Blade Problem Possible Corrective Cause Action TroubleshootingDozer Hydraulic System Without Auxiliary Hydraulic Lift Kit Hydraulic System DiagramDownward Pressure Adjustment AdjustmentsSkid Shoe Adjustment Lift Height AdjustmentInitial Assembly & Installation Attach Dozer Lift ArmAssemble Dozer Blade Install Front Hitch Mounting Brackets Install Rear Hitch Mounting BracketsFront Install Lift Rod Initial Assemble & InstallationInstall Attachment Lift Extension Install Hitch Onto TractorInstall Dozer Blade Old Master Valve Foam Screw Hair Pin Clip Actuator Arm Install New Master ValveHoles Install Cross-Over TubesInstall Bypass Hose & T-Connector Assemble Control ArmViewed From Right Side Assemble Control Valve Install Control ValveTo Front Cross- Over Tube To Back Cross Connect Hydraulic Hoses 2 Control Valve Hoses Install Hydraulic Cylinder On Dozer BladeAssemble Bypass Hose Dozer & Hitch Removal Normal Installation Remove Bypass Hose Hardware Identification & Torque Specifications