Initial Assembly & Installation

BI

D E

F

GH

J

N

C

A

M

 

To Front

B

 

 

 

 

Cross-Over

A. Control Valve

 

 

 

Tube

 

 

 

 

B. Cotter Pin

 

 

L

 

C. Clevis Pin

 

 

 

 

D. Control Lever

 

 

 

 

E. U-Link

 

 

 

 

F. Tall Fitting

 

 

K

 

G. Short Fitting

 

 

 

 

H. 1/2” x 75” Hose w/ Female Quick Connector

 

To Back

M

I. 1/2” x 75” Hose w/ Male Quick Connector

 

 

Cross-Over

J. 23/32” x 40” Hose w/ Male Quick Connector

 

 

 

Tube

 

K. 23/32” x 40” Hose w/ Female Quick Connector

 

 

 

 

 

L. Female Quick Connector

 

 

L

M. Male Quick Connector

 

 

 

 

N. Large Fitting

 

 

 

 

Figure 26. Assemble Control Valve

Install Control Valve

1.Locate the old single spool master valve removed from tractor (A, Figure 26).

NOTE: From this point on, the old master valve will be referred to as the control valve (A, Figure 26).

2.Install the control lever (D, Figure 26) using a small clevis pin (C), the U-link (E), and small cotter pins (B) as shown.

3.Install a tall fitting (F, Figure 26) and a short fitting (G) into the control valve (A) as shown.

4.Install a male quick connector (M, Figure 26) on one of the 1/2” x 75” long hoses (I), and connect the other end of the hose to the tall fitting (F)

5.Install a female quick connector (L, Figure 26) on the other 1/2” x 75” long hose (H) and connect it to the short fitting (G).

NOTE: The quick connector ends of the 1/2” x 75” hoses attached to the control valve in steps 4 and 5 will be con- nected to the dozer hydraulic hoses later.

6.Install two large fittings (N, Figure 26) in the front of the control valve (A).

7.Install a male quick connector (M, Figure 26) on one of the 23/32” x 40” hoses (J) and a female quick con- nector (L) on the other 23/32” x 40” hose (K).

17

Image 19
Contents Hydraulic Angling Dozer Blade Attachment OPERATOR’S ManualPage Table of Contents General Warnings Safety RulesAttachment Lift Angling Control LeverTwo-Speed Control Transporting OperationChecks Before Starting Engine & Ground Speed SelectionStorage Schedule For Normal Care MaintenanceLubricate Dozer Blade Problem Possible Corrective Cause Action TroubleshootingDozer Hydraulic System Without Auxiliary Hydraulic Lift Kit Hydraulic System DiagramDownward Pressure Adjustment AdjustmentsSkid Shoe Adjustment Lift Height AdjustmentAttach Dozer Lift Arm Initial Assembly & InstallationAssemble Dozer Blade Install Rear Hitch Mounting Brackets Install Front Hitch Mounting BracketsFront Install Lift Rod Initial Assemble & InstallationInstall Attachment Lift Extension Install Hitch Onto TractorInstall Dozer Blade Old Master Valve Foam Screw Hair Pin Clip Actuator Arm Install New Master ValveHoles Install Cross-Over TubesAssemble Control Arm Install Bypass Hose & T-ConnectorViewed From Right Side Assemble Control Valve Install Control ValveTo Front Cross- Over Tube To Back Cross Connect Hydraulic Hoses 2 Control Valve Hoses Install Hydraulic Cylinder On Dozer BladeAssemble Bypass Hose Dozer & Hitch Removal Normal Installation Remove Bypass Hose Hardware Identification & Torque Specifications