Snapper 2137 manual Install Cross-Over Tubes, Holes

Page 17

Initial Assembly & Installation

A

B

Figure 19. Install Quick Connectors

A. Male Connector

B. Female Connector

B

A

Figure 20. Cross-Over Tubes

A. Tube w/ Beaded End B. Tube w/ Threaded End

Install Cross-Over Tubes

1.Locate the metal cross-over tube with a male thread- ed fitting on one end and a female hex fitting on the other. Install one female quick connector (B, Figure 19) on the male threaded fitting.

2.Locate the metal cross-over tube with a male thread- ed fitting on one end and a bead on the other. Install one male quick connector (A, Figure 19) on the threaded end.

3.Install the cross-over tubes (A, B, Figure 20) under the tractor. Route the tubes through the frame as shown in Figures 20 and 22. The tube with the beaded end (A, Figure 20) goes in back, the tube with the hex fitting (B) goes in front.

4.Secure the tubes according to the following steps.

Use Back Set

of Holes

Viewed From Below

Figure 21. Mounting Hole Location

 

 

 

B

A

C

B

C

 

 

 

 

 

Clamp Assembly

 

 

D

 

 

 

A

 

 

 

B

E

 

 

 

 

 

 

C

Figure 22. Secure Cross-Over Tubes

A.

Cross-Over Tube

D. Large Washer

B.

Clamp

E. Lock Washer

C. Taptite Screw, 5/16-18x1 F. 5/16 Nut

Models with Kohler Air Cooled Engines:

a. Remove the two taptite screws (C, Figure 22) located in the rear holes (see Figure 21) and replace with two 5/16-18 x 1” taptite screws.

b. Secure the hoses using a large washer (D, Figure 22), lock washer (E), and clamp (B) as shown.

Models with Kawasaki Liquid Cooled Engines:

a. Secure the cross-over tubes to the bottom of the tractor using two 5/16-18 x 1” taptite screws (C, Figure 22), large washers (D), lock washers (E), and clamps (B) using the rear set of holes shown in Figure 21.

15

Image 17
Contents Hydraulic Angling Dozer Blade Attachment OPERATOR’S ManualPage Table of Contents General Warnings Safety RulesTwo-Speed Control Angling Control LeverAttachment Lift Checks Before Starting OperationEngine & Ground Speed Selection TransportingStorage Lubricate Dozer Blade MaintenanceSchedule For Normal Care Problem Possible Corrective Cause Action TroubleshootingDozer Hydraulic System Without Auxiliary Hydraulic Lift Kit Hydraulic System DiagramSkid Shoe Adjustment AdjustmentsLift Height Adjustment Downward Pressure AdjustmentAssemble Dozer Blade Initial Assembly & InstallationAttach Dozer Lift Arm Front Install Front Hitch Mounting BracketsInstall Rear Hitch Mounting Brackets Install Attachment Lift Extension Initial Assemble & InstallationInstall Hitch Onto Tractor Install Lift RodInstall Dozer Blade Old Master Valve Foam Screw Hair Pin Clip Actuator Arm Install New Master ValveHoles Install Cross-Over TubesViewed From Right Side Install Bypass Hose & T-ConnectorAssemble Control Arm Assemble Control Valve Install Control ValveTo Front Cross- Over Tube To Back Cross Connect Hydraulic Hoses 2 Control Valve Hoses Install Hydraulic Cylinder On Dozer BladeAssemble Bypass Hose Dozer & Hitch Removal Normal Installation Remove Bypass Hose Hardware Identification & Torque Specifications