Snapper 2137 manual Install Hydraulic Cylinder On Dozer Blade

Page 21

Install Hydraulic Cylinder On Dozer Blade

1.Install the cylinder (A, Figure 29) onto the dozer blade using clevis pins and hair pin clips (B) as shown. Connect the cylinder rod to the front of the dozer blade.

2.Install one hose fitting in each end of the cylinder.

3.Locate two 1/2” x 28” hoses. Install one male quick connector on one of the hoses and a female quick connector on the other.

4.Attach the 1/2” x 28” hose with the male quick con- nector (C, Figure 29) to the front (piston side) fitting of the cylinder.

5.Attach the 1/2” x 28” hose with the female connector (D, Figure 29) to the back (base side) fitting of the cylinder.

6.Route the hoses across the top of the dozer hitch to the right side of the tractor.

7.Connect the dozer hydraulic hoses (B, Figure 30) to the 1/2” x 75” long hoses (A) coming from the top of the control valve.

8.Secure the control valve hoses (A, Figure 30) to the control arm and ladder hitch using plastic tie straps.

9.Secure the dozer blade hoses (B, Figure 30) to the dozer blade hitch assemble using plastic tie straps.

Initial Assembly & Installation

D

C

B

A

Figure 29. Dozer Hydraulic Cylinder

A.Cylinder

B.Clevis Pin & Hair Pin Clip

C.1/2” x 28” Hose with Male Quick Connector

D.1/2” x 28” Hose with Female Quick Connector

A

B

Figure 30. Connect Hydraulic Hoses

A. 1/2” Control Valve Hoses

19

Image 21
Contents Hydraulic Angling Dozer Blade Attachment OPERATOR’S ManualPage Table of Contents General Warnings Safety RulesAngling Control Lever Attachment LiftTwo-Speed Control Checks Before Starting OperationEngine & Ground Speed Selection TransportingStorage Maintenance Schedule For Normal CareLubricate Dozer Blade Problem Possible Corrective Cause Action TroubleshootingDozer Hydraulic System Without Auxiliary Hydraulic Lift Kit Hydraulic System DiagramSkid Shoe Adjustment AdjustmentsLift Height Adjustment Downward Pressure AdjustmentInitial Assembly & Installation Attach Dozer Lift ArmAssemble Dozer Blade Install Front Hitch Mounting Brackets Install Rear Hitch Mounting BracketsFront Install Attachment Lift Extension Initial Assemble & InstallationInstall Hitch Onto Tractor Install Lift RodInstall Dozer Blade Old Master Valve Foam Screw Hair Pin Clip Actuator Arm Install New Master ValveHoles Install Cross-Over TubesInstall Bypass Hose & T-Connector Assemble Control ArmViewed From Right Side Assemble Control Valve Install Control ValveTo Front Cross- Over Tube To Back Cross Connect Hydraulic Hoses 2 Control Valve Hoses Install Hydraulic Cylinder On Dozer BladeAssemble Bypass Hose Dozer & Hitch Removal Normal Installation Remove Bypass Hose Hardware Identification & Torque Specifications