Install Hydraulic Cylinder On Dozer Blade
1.Install the cylinder (A, Figure 29) onto the dozer blade using clevis pins and hair pin clips (B) as shown. Connect the cylinder rod to the front of the dozer blade.
2.Install one hose fitting in each end of the cylinder.
3.Locate two 1/2” x 28” hoses. Install one male quick connector on one of the hoses and a female quick connector on the other.
4.Attach the 1/2” x 28” hose with the male quick con- nector (C, Figure 29) to the front (piston side) fitting of the cylinder.
5.Attach the 1/2” x 28” hose with the female connector (D, Figure 29) to the back (base side) fitting of the cylinder.
6.Route the hoses across the top of the dozer hitch to the right side of the tractor.
7.Connect the dozer hydraulic hoses (B, Figure 30) to the 1/2” x 75” long hoses (A) coming from the top of the control valve.
8.Secure the control valve hoses (A, Figure 30) to the control arm and ladder hitch using plastic tie straps.
9.Secure the dozer blade hoses (B, Figure 30) to the dozer blade hitch assemble using plastic tie straps.
Initial Assembly & Installation
D |
C |
B |
A |
Figure 29. Dozer Hydraulic Cylinder
A.Cylinder
B.Clevis Pin & Hair Pin Clip
C.1/2” x 28” Hose with Male Quick Connector
D.1/2” x 28” Hose with Female Quick Connector
A | B |
Figure 30. Connect Hydraulic Hoses
A. 1/2” Control Valve Hoses
19