Snapper 2137 manual Remove Bypass Hose

Page 25

5.Remove the bypass hose (Figure 41) from the cross- over tubes.

See Figure 42.

6.Connect the 23/32” x 40” hoses (B) from the control valve to the the cross-over tubes (A).

7.Connect the 1/2” x 75” hoses (C) from the control valve to the dozer hoses (D).

8.Lubricate the dozer as shown in the Maintenance section of this manual.

9.Perform all adjustments as shown in the Adjustments section of this manual.

Normal Installation

Do Not Kink

Bypass Hose

Figure 41. Remove Bypass Hose

A

B

D

C

Figure 42. Connect Hydraulic Hoses

A.Cross-Over Tubes

B.23/32” Control Valve Hoses

C.1/2” Control Valve Hoses

D.1/2” Dozer Blade Hoses

23

Image 25
Contents Hydraulic Angling Dozer Blade Attachment OPERATOR’S ManualPage Table of Contents General Warnings Safety RulesAttachment Lift Angling Control LeverTwo-Speed Control Checks Before Starting OperationEngine & Ground Speed Selection TransportingStorage Schedule For Normal Care MaintenanceLubricate Dozer Blade Problem Possible Corrective Cause Action TroubleshootingDozer Hydraulic System Without Auxiliary Hydraulic Lift Kit Hydraulic System DiagramSkid Shoe Adjustment AdjustmentsLift Height Adjustment Downward Pressure AdjustmentAttach Dozer Lift Arm Initial Assembly & InstallationAssemble Dozer Blade Install Rear Hitch Mounting Brackets Install Front Hitch Mounting BracketsFront Install Attachment Lift Extension Initial Assemble & InstallationInstall Hitch Onto Tractor Install Lift RodInstall Dozer Blade Old Master Valve Foam Screw Hair Pin Clip Actuator Arm Install New Master ValveHoles Install Cross-Over TubesAssemble Control Arm Install Bypass Hose & T-ConnectorViewed From Right Side Assemble Control Valve Install Control ValveTo Front Cross- Over Tube To Back Cross Connect Hydraulic Hoses 2 Control Valve Hoses Install Hydraulic Cylinder On Dozer BladeAssemble Bypass Hose Dozer & Hitch Removal Normal Installation Remove Bypass Hose Hardware Identification & Torque Specifications