Snapper 2137 Install New Master Valve, Old Master Valve Foam Screw Hair Pin Clip Actuator Arm

Page 16

Initial Assemble & Installation

Install New Master Valve

1.Remove the two screws that connect the plastic upper dash to the left side of the lower air screen to provide access to the master valve.

2.Remove the foam (A, Figure 17) located below the master valve (B).

3.Note the markings on the body of the master valve (B, Figure 17). Label the hoses with these same markings and disconnect the hoses.

4.Remove the hairpin clip (E, Figure 17) securing the actuating arm (C).

5.Remove & retain the two screws (D, Figure 17) securing the master valve (B) and remove the valve assembly.

6.Transfer the hose fittings from the old valve to the new master valve. Retain the old master valve.

NOTE: The old master valve will be used as the control valve later.

 

 

 

B

 

 

 

OUTT

 

IN

O

D

 

 

 

 

 

D

 

 

BYD

 

 

D

 

 

 

C

 

 

 

E

A

 

 

 

Figure 17. Old Master Valve

 

A. Foam

D. Screw

B. Master Valve

E. Hair Pin Clip

C. Actuator Arm

 

7.Install a new right-angle fitting (F, Figure 18) in the power beyond port of the new valve

8.Connect the actuator arm (C, Figure 18) to the new master valve using a hair pin clip (E) and secure the valve using the two screws (D) removed in step 5.

9.Reattach the hoses to the new valve.

 

 

B

F

 

 

 

OUTT

 

 

D

 

 

 

O

 

 

 

IN

 

 

 

 

BYD

 

C

 

D

 

 

 

 

 

 

 

E

D

 

 

 

A

 

 

 

Figure 18. New Master Valve and Fittings

A. Foam

D. Screw

B. Master Valve

E. Hair Pin Clip

C. Actuator Arm

F. Right Angle Fitting

14

Image 16
Contents OPERATOR’S Manual Hydraulic Angling Dozer Blade AttachmentPage Table of Contents Safety Rules General WarningsAttachment Lift Angling Control LeverTwo-Speed Control Operation Checks Before StartingEngine & Ground Speed Selection TransportingStorage Schedule For Normal Care MaintenanceLubricate Dozer Blade Troubleshooting Problem Possible Corrective Cause ActionHydraulic System Diagram Dozer Hydraulic System Without Auxiliary Hydraulic Lift KitAdjustments Skid Shoe AdjustmentLift Height Adjustment Downward Pressure AdjustmentAttach Dozer Lift Arm Initial Assembly & InstallationAssemble Dozer Blade Install Rear Hitch Mounting Brackets Install Front Hitch Mounting BracketsFront Initial Assemble & Installation Install Attachment Lift ExtensionInstall Hitch Onto Tractor Install Lift RodInstall Dozer Blade Install New Master Valve Old Master Valve Foam Screw Hair Pin Clip Actuator ArmInstall Cross-Over Tubes HolesAssemble Control Arm Install Bypass Hose & T-ConnectorViewed From Right Side Install Control Valve Assemble Control ValveTo Front Cross- Over Tube To Back Cross Install Hydraulic Cylinder On Dozer Blade Connect Hydraulic Hoses 2 Control Valve HosesAssemble Bypass Hose Dozer & Hitch Removal Normal Installation Remove Bypass Hose Hardware Identification & Torque Specifications