65 Series Rotary Tiller
ASSEMBLY
The machine is shipped with the PTO shaft not installed.
To install the PTO driveline on the machine, follow this procedure:
1.Clear the area of bystanders, especially small children.
2.Clean the splines on the yoke and the input shaft.
3.Align the splines on the yoke and the shaft.
4.Depress the locking pin and slide the yoke on the shaft.
5.Be sure the yoke is locked in position. Pull on the yoke to be sure the pin clicks into position.
6.Be sure that the PTO shaft is the appropriate length for the tractor/Tiller combination. Refer to Driveline Dimension Section for details.
30