Baldor AE12 manual Electrical Installation Guidelines, Remote Start Connections

Page 20

ELECTRICAL INSTALLATION GUIDELINES

Incorrect installation of the generator set could result in property damage, injury, or death! Installation of this generator set must be performed by qualified / professional technicians or contractors.

This information is for general reference only! It must not be used as

the single source of information for installing the generator set. For more specific/detailed information read the installation manual that accompanied the generator set as well as the transfer switch manual.

There are two main wiring circuits that must be installed by a licensed electrician to properly interface your Baldor Pow'R Gard generator set with your transfer switch and the building/facility it will be providing power to. The connection on the generator set consists of two terminal blocks, which are located on the generator set.

On units with the factory installed enclosure, the connection box is located in the engine enclosure bulkhead. Access to the customer connection box is achieved by removing the appropriate louvered enclosure end panel (See Drawing on following page).

On units without the factory installed enclosure the customer connection box is located either above the generator windings or it is mounted on the generator frame next to the unit.

REMOTE START CONNECTIONS

These terminal block- connecting points (See figure 1) are where you connect the two wires from the remote start contacts of the transfer switch. Once a connection is made across these connecting points (via the transfer switch or some other switch device), a circuit is completed to the control logic of the generator set causing the unit to start. The unit will remain running until this connection is opened. Once the remote start connection is opened, the logic circuitry allows the engine to run for approximately 60-90 seconds before it shuts off. This time delay is to allow the engine to run unloaded for a period of time to cool down.

Page 13 of 45

Image 20
Contents Automatic Emergency Powr Products Model AE12 GeneratorSafety Warnings Page Page Page Table of Contents Customer Connection Wiring Diagram AE12 Base Outline Drawing Forward Specifications for Your AE12 bBALDOR Generator SET Location Connection Information Page Engine Information Maintenance Generator END MaintenanceCleaning InspectingEngine Maintenance AdjustmentsStorage or Long Term NON-USAGE Service Ordering PartsGeneral Installation & Site Selection Guidelines Safety ConsiderationsMiscellaneous Considerations Cooling ConsiderationsNoise Considerations Electrical Installation Guidelines Remote Start ConnectionsAC Power Connections Units with Factory Installed EnclosureUnits Without Enclosure Page Gaseous Fuel Information Gaseous Fuel Supply PipingPrimary Regulator not supplied Secondary Regulator suppliedLP Tanks LP Cylinder TanksManual Fuel Valves Fuel valvesElectric fuel shut-off valves Propane GAS Flow Chart Pipe Capacity in Cubic FeetNatural GAS Flow Chart Master Control Switch OperationPrior to Starting the Unit Controls and Their FunctionsCircuit Breaker Fault Indicator LightFuse for the Control Logic Board Simple Troubleshooting Possible ProblemsLOW Voltage Output Initial Checks Troubleshooting for Gaseous Fuel SystemBasic Description Order of Occurrence AdjustmentsProblems and Possible Solutions Page Generator Fails to Start GO to Starter Solenoid on EnginePage AE Series Interconnection AbbreviationsPage Page Page Page Page Page Page Page Page For AE12 Units with Enclosure Limited Warranty Owner’s Responsibilities Page California Proposition 65 Warning