AE SERIES

INTERCONNECTION

THE FOLLOWING ARE PRINCIPLES OF INSTALLATION.

PLEASE NOTE: LOCAL, FEDERAL, OR NEC CODES PREVAIL OVER THESE SUGGESTIONS.

Abbreviations:

 

 

GEN

=

Generator Assembly

ATS

=

Automatic Transfer Switch

Load Center

=

Customer's Normal Panel

Emergency Load Center

=

Those circuits in a separate load box that will

 

 

be powered by the generator.

Public Service

=

Normal Power Supplier

GEN to ATS Wiring:

?3 wires for AC load (4 if three phase) sized for the generator's load amperage.

?A Ground wire is to connect all circuits (GEN, ATS, Load Centers) to the building's ground system.

?2 wires, 14 gauge twisted pair for GEN remote start signal.

GEN to ATS Optional:

?120 -volt feed for GEN mounted battery charger.

?12 -volt wires (4) for building mounted battery charger.

Load center to ATS:

?3 wires for AC feed (four for three phase), sized for ATS rating.

?A ground wire is connected to all circuits (GEN, ATS, Load Centers) to the building's ground system.

ATS to emergency Load Center:

?3 wires for AC feed (four for three phase), sized for ATS rating.

?A ground wire is to connect all circuits (GEN, ATS, Load Centers) to the building's ground system.

Page 31 of 45

Image 38
Contents Automatic Emergency Powr Products Model AE12 GeneratorSafety Warnings Page Page Page Table of Contents Customer Connection Wiring Diagram AE12 Base Outline Drawing Forward Specifications for Your AE12 bBALDOR Generator SET Location Connection Information Page Engine Information Cleaning MaintenanceGenerator END Maintenance InspectingEngine Maintenance AdjustmentsStorage or Long Term NON-USAGE Service Ordering PartsGeneral Installation & Site Selection Guidelines Safety ConsiderationsMiscellaneous Considerations Cooling ConsiderationsNoise Considerations Electrical Installation Guidelines Remote Start ConnectionsAC Power Connections Units with Factory Installed EnclosureUnits Without Enclosure Page Gaseous Fuel Information Gaseous Fuel Supply PipingLP Tanks Primary Regulator not suppliedSecondary Regulator supplied LP Cylinder TanksManual Fuel Valves Fuel valvesElectric fuel shut-off valves Propane GAS Flow Chart Pipe Capacity in Cubic FeetNatural GAS Flow Chart Prior to Starting the Unit Master Control SwitchOperation Controls and Their FunctionsCircuit Breaker Fault Indicator LightFuse for the Control Logic Board Simple Troubleshooting Possible ProblemsLOW Voltage Output Initial Checks Troubleshooting for Gaseous Fuel SystemBasic Description Order of Occurrence AdjustmentsProblems and Possible Solutions Page Generator Fails to Start GO to Starter Solenoid on EnginePage AE Series Interconnection AbbreviationsPage Page Page Page Page Page Page Page Page For AE12 Units with Enclosure Limited Warranty Owner’s Responsibilities Page California Proposition 65 Warning