Baldor Automatic Emergency Pow'r Products, AE12 manual AC Power Connections

Page 21

AC POWER CONNECTIONS

These terminal block connections are used to interface the wires/cables from the emergency power supply input terminals located inside the transfer switch.

BATTERY CHARGER CONNECTIONS (OPTIONAL)

If you purchased a Master Control Systems Inc. Battery charger with your generator set you must run two sets of wires from the battery charger to the generator set.

UNITS WITH FACTORY INSTALLED ENCLOSURE

The terminal block that contains the connection points for the remote start on the enclosed units also contains the connection points for interfacing the battery charger to the generator set.

The wires from the terminals labeled DK1 and DK2 on the battery charger go to the D1 and D2 terminal connection points on the terminal block pictured in figure 3.

The wires from the terminals labeled B+ and B- on the battery charger go to the POS and NEG terminal connection points on the terminal block pictured in figure 3.

Page 14 of 45

Image 21
Contents Model AE12 Generator Automatic Emergency Powr ProductsSafety Warnings Page Page Page Table of Contents Customer Connection Wiring Diagram AE12 Base Outline Drawing Forward Specifications for Your AE12 bBALDOR Generator SET Location Connection Information Page Engine Information Generator END Maintenance MaintenanceCleaning InspectingAdjustments Engine MaintenanceStorage or Long Term NON-USAGE Ordering Parts ServiceSafety Considerations General Installation & Site Selection GuidelinesCooling Considerations Noise ConsiderationsMiscellaneous Considerations Remote Start Connections Electrical Installation GuidelinesUnits with Factory Installed Enclosure AC Power ConnectionsUnits Without Enclosure Page Gaseous Fuel Supply Piping Gaseous Fuel InformationSecondary Regulator supplied Primary Regulator not suppliedLP Tanks LP Cylinder TanksFuel valves Electric fuel shut-off valvesManual Fuel Valves Pipe Capacity in Cubic Feet Propane GAS Flow ChartNatural GAS Flow Chart Operation Master Control SwitchPrior to Starting the Unit Controls and Their FunctionsFault Indicator Light Fuse for the Control Logic BoardCircuit Breaker Possible Problems Simple TroubleshootingLOW Voltage Output Troubleshooting for Gaseous Fuel System Basic DescriptionInitial Checks Adjustments Problems and Possible SolutionsOrder of Occurrence Page GO to Starter Solenoid on Engine Generator Fails to StartPage Abbreviations AE Series InterconnectionPage Page Page Page Page Page Page Page Page For AE12 Units with Enclosure Limited Warranty Owner’s Responsibilities Page California Proposition 65 Warning