Swim'n Play Above Ground Swimming Pool Bottom Rail and Strap Layout, Example of Basic Layout

Page 10

BOTTOM RAIL AND STRAP LAYOUT

 

4

Follow the instructions below to properly layout the rail and strap assemblies.

 

 

 

 

 

 

 

 

 

 

 

 

 

QUANTITIES NEEDED:

 

 

 

 

 

 

 

 

 

 

 

 

 

POOL SIZE

16 x 10

18 x 12

24 x 12

24 x 15

30 x 15

33 x 18

39 x 18

45 x 18

STRAP ASSEMBLIES

3

3

5

4

6

6

8

10

 

 

 

 

 

 

 

 

 

SHORT RAILS

4

4

8

6

10

10

14

18

 

 

 

 

 

 

 

 

 

LONG RAILS

10

10

10

10

10

12

12

12

BOTTOM PLATES

8

8

8

8

8

10

10

10

EXAMPLE OF BASIC LAYOUT

Ground Shield

(Optional)

Long

Bottom Rail

Bottom Plate

Patio Block

 

Strap Assembly

 

Short

 

 

 

Bottom Rail

 

BOTTOM RAIL

BOTTOM PLATE

 

PATIO BLOCK

1/16”

PRE WASHED SAND OR

SIFTED EARTH RECOMMENDED

REQUIREMENT CHART

POOL SIZE

TONS

YARDS

 

 

 

16’ x 10’

2.0 Tons

1.3 Cu.

 

 

 

18’ x 12’

2.4 Tons

1.6 Cu.

24’ x 12’

3.3 Tons

2.2 Cu.

24’ x 15’

3.8 Tons

2.5 Cu.

 

 

 

30’ x 15’

4.8 Tons

3.2 Cu.

 

 

 

33’ x 18’

6.0 Tons

4.0 Cu.

39’ x 18’

7.2 Tons

4.8 Cu.

45’ x 18’

8.3 Tons

5.5 Cu.

 

 

 

GROUND SHIELD AND

WALL GUARD ARE OPTIONAL

Spread a ground shield or plastic sheeting over prepared ground (not included). Ground Shield and Wall Guard are available from your local pool supply dealer or polyethylene sheeting can be purchased from a local hard- ware supply. This will protect your pool liner and metal parts against chemical reactions from the ground soil.

 

 

 

 

Short

Long

Bottom Rail

Bottom Rail

 

 

From Oval End of Pool

Mark out pool radius (1/2 pool width) using stakes "B" as a reference. Form the two end semicircles by sliding the long bottom rail groove up, into the bottom plates. Lay out the strap assemblies as shown removing the stakes as you go. The distance from strap to strap is 36". Install the short bottom rail in between each strap as shown.

Bring the required amount of sifted earth or pre-washed sand into the pool area at this time. Refer to chart above for the required minimum amount. Place patio blocks under all bottom plates and end of strap assemblies.

10

Image 10
Contents Oval Pool Contract Installations Introduction Some Friends To Help OUTInstallation Assembly Steps Aluminum Pools Vertical Actual Pool Dimensions Clearance Size Preparing the GroundLeveling the Ground Nail Center Stake Clearance RadiusAssembling the Bottom Straps SizesBottom Rail Bottom Plate Patio Block Bottom Rail and Strap LayoutExample of Basic Layout Ground Shield Wall Guard are OptionalScrew Insert Wall Into Bottom RailsClosing the Wall Serrated Flange NUTProtect Your Liner Assemble ButtressRechecking Your Work Hold Down SheetOnly THRU-THE-WALL SkimmerEarth Mound Earth MoundCorrect Liner InstallationLiner IncorrectEZ Hook Liner Installation CoveVERTICALS, TOP Plates and Rails PRE-ASSEMBLY of TOP PlatesVertical Buttress Rail Installing Ledges Placement of Warning LabelsInstalling TOP Covers 7 Deluxe TOP CoversTOP Cover Ledge 9 TWO-PIECE Wrap around Cover Pedestal Inside CoverSafety Brochures and Education Programs Pool User Warning LabelsSafety Tips Rules and Regulations Winter Care Preventative Maintenance TipsLife Saving Equipment Care of Pool WaterANY Objects That MAY Provide Access to the Pool Regina Avenue